No. crt. | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
PRNV/2023/AT/1 | P8 | AT | 322335 | 1 | Support for ADR North-West, as the Management Authority, for the implementation of the North-West Regional Program in the North-West Development Region, in the period 2021-2023 | ADR North-West | The municipality of Cluj-Napoca | 37,066,098.44 | 31,506,183.68 | 5,559,914.76 | 0.00 | 0.00 | 37,066,098.44 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 300242 | 2 | Construction and rehabilitation of secondary road links to the road network and TEN-T nodes in Bihor County | UAT Bihor County | Salonta municipality | 23/12/2021 | 31/12/2027 | 297,827,999.75 | 253,153,799.79 | 38,717,639.96 | 5,956,560.00 | 334,843,791.40 | 632,671,791.15 | Signed contract | ||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300350 | 7 | Establishment and development of Tașnad Urban Garden | UAT Tașnad City | Satu Mare | The project proposes the establishment of an urban garden-type green space on a degraded and unused land, according to letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the urban areas. The location of the investment, free of above-ground constructions, is registered in the Register of green spaces as degraded land, according to extracts CF 101921, 101922. The Urban Garden is organized in three main areas: an area equipped with playgrounds for children, teenagers and young people, a area containing a basketball court bordered by a small natural amphitheater and 16 themed "grassland lounges". Three of these "lounges" are located in the active area of the Garden, where athletes and spectators can meet and spend time together. The others are hidden in the pre-existing deciduous forest, so the experience amounts to complete immersion in nature. | 24,515,127.70 | 20,837,858.54 | 3,186,966.59 | 490,302.57 | 778,052.79 | 25,293,180.49 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300351 | 6 | IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: DEVELOPING A PARK ON BERZEI STR. SANTANDREI MUNICIPALITY, BIHOR COUNTY, respectively DEVELOPING A PARK ON STRADA KLOPOTEILOR, SANTANDREI MUNICIPALITY, BIHOR COUNTY | UAT Commune of Santander | Santandrei | This project proposes the establishment of green spaces of the square type, in accordance with letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the rural areas of localities, because this area is degraded, unused land. The arrangement will be approached in an integrated manner and will be carried out on the basis of a complex specialized project aimed at improving the rural image, protecting biodiversity, developing connections and pedestrian movements, creating attractive recreation areas, organizing urban furniture and vegetation in accordance with the specifics of the area. The main purpose of the proposed works is to increase the quality of life of the residents of the adjacent neighborhood, it is desired that the park be an attractive space for all age groups, a space for both active and passive rest intended at the same time for sports, relaxation and walks. | 24,305,093.15 | 20,659,329.18 | 3,159,662.11 | 486,101.86 | 799,061.20 | 25,104,154.35 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300352 | 4 | Establishment and Development of the "Urban Garden Transilvania" Botanical Park | UAT Beclean City | Beclean city | The project aims to establish and arrange a new green space that will have an area of 41321 square meters. The basic investment will be made in the city of Beclean - Land Deed no. 30510 (land surface 41321 sqm), land located in the inner city. The proposed botanical park covers approximately 4 hectares and is part of the extended project of the Transilvania Urban Garden in the city of Beclean. The proposed park is divided into 4 main areas: 1. Relaxation area (mounded area - located in the southeast allowing people to interact with each other thanks to welcoming open spaces. 2. Buffer zone (dense vegetation) 3. Protected plantation (Romanian species on the verge of extinction - with grass plantation, it is proposed to restore and protect the fauna of the place.) 4. Noisy area (Sports activities). | 24,147,606.65 | 20,525,465.64 | 3,139,188.85 | 482,952.16 | 764,542.33 | 24,912,148.98 | Signed contract | |||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300542 | 5 | Increasing energy efficiency and rehabilitating the building located in Oradea, strada Republicii no. 35 | UAT Bihor County | Bihor | 04/12/2023 | 05/02/2024 | 23,147,275.27 | 19,675,183.97 | 3,009,145.79 | 462,945.51 | 24,912,535.70 | 48,059,810.97 | Signed contract | ||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300543 | 8 | Cresterea eficientei energetice si gestionarea Inteligenta a energiei in cladirile publice cu destinatie de unitati de invatamant – Liceul Teoretic German F. Schiller | UAT Oradea Municipality | Oradea municipality | 04/12/2023 | 22/02/2024 | 9,408,599.19 | 7,997,309.31 | 1,223,117.89 | 188,171.99 | 6,426,799.41 | 15,835,398.60 | Signed contract | ||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301378 | 23 | Increasing urban mobility in the city of Taşnad by creating the mobility corridor in the North-West direction | UAT Tașnad City | Taşnad city | 31,162,080.82 | 26,487,768.70 | 4,051,070.42 | 623,241.70 | 1,869,849.02 | 33,031,929.84 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301400 | 40 | CREATION OF BAIA SPRIE-CHIUZBAIA MOBILITY CORRIDOR | UAT City of Baia Sprie | City of Baia Sprie | 88,355,310.03 | 75,102,013.53 | 11,486,190.31 | 1,767,106.19 | 7,780,247.25 | 96,135,557.28 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301405 | 16 | GHERLA 2 MOBILITY CORRIDOR | UAT Gherla Municipality | The municipality of Gherla | 88,603,652.82 | 75,313,104.90 | 11,518,474.86 | 1,772,073.06 | 6,639,343.88 | 95,242,996.70 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301398 | 28 | URBAN MOBILITY CORRIDOR BY CREATING CYCLE PATHS AND PRIORITY CORRIDOR FOR ECOLOGICAL PUBLIC TRANSPORT. ROUTE I FROM EAST TO WEST AND ROUTE II FROM SOUTH TO WEST IN THE MUNICIPALITY OF SALONTA | UAT Salonta Municipality | Salonta municipality | 70,158,693.21 | 59,634,889.23 | 9,120,630.12 | 1,403,173.86 | 3,583,202.80 | 73,741,896.01 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301393 | 22 | GHERLA MOBILITY CORRIDOR 1 | UAT Gherla Municipality | The municipality of Gherla | 15/09/2023 | 80,722,235.10 | 68,613,899.83 | 10,493,890.56 | 1,614,444.71 | 5,957,524.32 | 86,679,759.42 | Signed contract | |||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301478 | 59 | Implementation of solutions to increase traffic safety on the county road network in Bihor County | UAT Bihor County | Bihor | 74,456,961.28 | 63,288,417.09 | 967,940,497.00 | 1,489,139.22 | 17,476,140.19 | 91,933,101.47 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301606 | 19 | ESTABLISHMENT OF ALESD INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Elected city | 21,560,796.36 | 7,330,670.76 | 1,293,647.78 | 12,936,477.82 | 958,021.90 | 22,518,818.26 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301609 | 27 | ESTABLISHMENT OF BEIUȘ INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Beiuş municipality | 23,698,193.84 | 8,057,385.90 | 1,421,891.63 | 14,218,916.31 | 20,431,236.79 | 44,129,430.63 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301612 | 29 | MARGHITA INTELLIGENT SPECIALIZATION PARK ESTABLISHMENT | UAT Bihor County | Marghita municipality | 24,223,222.05 | 8,578,475.68 | 1,513,848.65 | 14,130,897.72 | 6,492,484.27 | 30,715,706.32 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301602 | 20 | Baia Sprie Intelligence Specialization Park Development | UAT Maramureș County | City of Baia Sprie | 39,005,020.74 | 16,674,883.81 | 2,942,626.56 | 19,387,510.37 | 14,262,285.34 | 53,267,306.08 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301558 | 39 | Creation and development of the intelligent specialization park Somcuta Mare, Maramures county | UAT Maramureș County | Somcuţa Mare city | 30,303,946.90 | 13,101,456.68 | 2,312,021.77 | 14,890,468.45 | 2,840,964.92 | 33,144,911.82 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301604 | 44 | Targu Lapus Intelligence Specialization Park Development | UAT Maramureș County | Town of Târgu Lăpuş | 21,396,260.69 | 9,191,160.79 | 1,621,969.55 | 10,583,130.35 | 8,077,330.74 | 29,473,591.43 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301621 | 26 | ESTABLISHMENT OF INTELLIGENT SPECIALIZATION PARK STEI | UAT Bihor County | City of Stei | 27,140,000.34 | 9,373,519.73 | 1,654,150.54 | 16,112,330.07 | 578,460.18 | 27,718,460.52 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302122 | 21 | Rehabilitation of the municipal museum in Beius | UAT Beiuș Municipality | Beiuş municipality | 18,300,168.11 | 15,555,142.89 | 2,379,014.02 | 366,011.20 | 0.00 | 18,300,168.11 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302106 | 17 | Restoration of the Synagogue building | UAT City of Seini | Seini city | 10,856,606.58 | 9,228,115.59 | 1,411,358.82 | 217,132.17 | 1,359,161.60 | 12,215,768.18 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302121 | 3 | REHABILITATION, RESTORATION AND INTRODUCTION TO THE TOURIST CIRCUIT OF THE METROPOLITAN CATHEDRAL IN CLUJ NAPOCA | ARCHBISHOP OF VAD FELEACULI AND CLJUI | The municipality of Cluj-Napoca | 34,461,307.41 | 28,706,269.02 | 5,065,812.19 | 689,226.20 | 22,433,720.04 | 56,895,027.45 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302104 | 12 | Rehabilitation and enhancement of the Bathory Fortress Ensemble | UAT Simleu City of Silvania | City of Simleu Silvaniei | 34,746,496.03 | 29,534,521.63 | 4,517,044.48 | 694,929.92 | 3,058,149.36 | 37,804,645.39 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302040 | 33 | REHABILITATION AND RESTRUCTURING BUILDING C1 AND BUILDING C3, CHANGE OF DESTINATION OF BUILDING C1 FROM PARISH HOUSE TO CULTURAL FUNCTIONS AND INTRODUCING THE HOLY TRINITY COMPLEX IN CLUJ-NAPOCA INTO THE TOURIST CIRCUIT, EXTERIOR ARRANGEMENTS AND SITE ORGANIZATION | Holy Trinity Romanian Orthodox Parish | The municipality of Cluj-Napoca | 10,857,386.54 | 9,044,202.95 | 1,596,035.82 | 217,147.77 | 10,504,921.08 | 21,362,307.62 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302105 | 25 | Dezvoltarea Integrată și Durabilă a Patrimoniului și Turismului Cultural în Municipiul Carei – Complex Castel Karolyi și Parc Dendrologic – Etapa a II-a | UAT Carei Municipality | The municipality of Carei | 34,746,599.99 | 29,534,609.99 | 4,517,058.00 | 694,932.00 | 5,382,706.92 | 40,129,306.91 | Signed contract | ||||||
PRNV/2023/721/1 | Q7 | OS5.2 | 302216 | 51 | Rehabilitation and capitalization in the tourist circuit of the Geza Teleki Castle in the town of Pribilesti | UAT Maramureș County | satulung | 33,578,647.64 | 28,541,850.49 | 4,365,224.20 | 671,572.95 | 27,597,632.29 | 61,176,279.93 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 302109 | 18 | Rehabilitation of Juhasz Gyula High School | UAT Oradea Municipality | Oradea municipality | 18/01/2024 | 05/04/2024 | 10,678,279.72 | 9,076,537.76 | 1,388,176.35 | 213,565.61 | 762,366.13 | 11,440,645.85 | Signed contract | ||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303539 | 45 | SLOW MOBILITY CORRIDOR - CRASNA RIVER BEACH IN THE CITY OF SIMLEU SILVANIEI | UAT Simleu City of Silvania | City of Simleu Silvaniei | 23,203,284.82 | 19,722,792.10 | 3,016,427.02 | 464,065.70 | 0.00 | 23,203,284.82 | Signed contract | ||||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303536 | 54 | Urban regeneration in the City of Sângeorz-Băi | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 14,081,054.24 | 11,968,896.10 | 1,830,537.05 | 281,621.09 | 506,075.56 | 14,587,129.80 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300583 | 32 | Energy rehabilitation for the A building of the Clinical Recovery Hospital Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 16,253,989.49 | 13,815,891.07 | 2,113,018.62 | 325,079.80 | 779,049.74 | 17,033,039.23 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300584 | 31 | Thermal rehabilitation and energy efficiency of the Clinical Hospital for Infectious Diseases Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 18/01/2024 | 20/05/2024 | 34,576,087.68 | 29,389,674.53 | 4,494,891.37 | 691,521.78 | 4,630,256.24 | 39,206,343.92 | Signed contract | ||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301724 | 24 | Development of uneven intersection between DJ 767M and DC 44 in order to increase traffic safety | UAT Bihor County | OSORHEI | 55,474,413.26 | 47,153,251.27 | 7,211,673.73 | 1,109,488.26 | 6,729,742.25 | 62,204,153.51 | Signed contract | ||||||
PRNV/2023/522.B/1 | P5 | OS3.2 | 303552 | 9 | Equipment for increasing traffic safety in Cluj county | UAT Cluj County | AGHIRESU | 18/03/2024 | 5,121,216.66 | 4,353,034.16 | 665,758.16 | 102,424.34 | 0.00 | 5,121,216.66 | Signed contract | |||||
PRNV/2023/623/1 | P6 | OS4.2 | 304325 | 10 | Modernization and rehabilitation of the educational structure Anatomie Building, str. Clinicilor no. 3-5, Cluj-Napoca | UNIVERSITY OF MEDICINE AND PHARMACY, IULIU HATIEGANU"" CLUJ NAPOCA | The municipality of Cluj-Napoca | 32,543,279.99 | 16,271,640.00 | 15,620,774.39 | 650,865.60 | 23,446,644.17 | 55,989,924.16 | Signed contract | ||||||
PRNV/2023/623/1 | P6 | OS4.2 | 304328 | 15 | The development of the educational infrastructure of the Technical University of Cluj-Napoca by rehabilitating and equipping CORP C1 Str. Observatory, no. 2, Cluj-Napoca municipality" | TECHNICAL UNIVERSITY OF CLUJ NAPOCA | The municipality of Cluj-Napoca | 05/12/2023 | 02/04/2024 | 32,517,074.29 | 16,258,537.15 | 15,608,195.65 | 650,341.49 | 503,085.16 | 33,020,159.45 | Signed contract | ||||
PRNV/2023/623/1 | P6 | OS4.2 | 304295 | 11 | Modernization of the educational infrastructure for the students of the Faculty of Medicine and Pharmacy - building C2, campus III | ORADEA UNIVERSITY | Oradea municipality | 10,126,102.68 | 5,063,051.37 | 4,860,529.25 | 202,522.06 | 0.00 | 10,126,102.68 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305885 | 34 | Building building (1-2S)+P+E+R/M with medical clinic destination | OSTEOPROTECT SRL | Oradea municipality | 15,883,278.23 | 6,286,765.74 | 1,109,429.25 | 8,487,083.24 | 682,971.53 | 16,566,249.76 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305883 | 38 | Construction and equipment of a recovery center with S+P+E+M height regime in Ardud Vii locality, Satu Mare county | VITAL CLINIQUE SRL | Oraş Ardud | 10,108,639.92 | 6,212,817.96 | 1,096,379.64 | 2,799,442.32 | 7,903,024.30 | 18,011,664.22 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305886 | 35 | Increasing the competitiveness of the Medimage clinic by diversifying medical services | MEDIMAGES SRL | The municipality of Cluj-Napoca | 11,144,167.60 | 5,863,167.88 | 1,034,676.68 | 4,246,323.04 | 0.00 | 11,144,167.60 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309660 | 13 | Intelligent production: automations and innovations | FLACARA IMPEX SRL | Bistrita municipality | 4,549,805.21 | 2,763,489.09 | 487,674.55 | 2,178,261.66 | 879,260.09 | 5,429,425.30 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309132 | 30 | INCREASING THE COMPETITIVENESS OF FEMARIS SRL THROUGH THE CONSTRUCTION OF A PRODUCTION HALL AND EQUIPPED WITH PERFORMING EQUIPMENT | FEMARIS SRL | OSORHEI | 6,415,176.25 | 3,445,583.15 | 608,044.09 | 2,361,549.01 | 1,206,243.09 | 7,621,419.34 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310555 | 43 | Advanced technologies in equipment production | INOTEC SRL | The municipality of Cluj-Napoca | 2,284,107.57 | 1,032,370.71 | 182,183.07 | 1,069,553.79 | 652,874.83 | 2,936,982.40 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310437 | 55 | INCREASING COMPETITIVENESS AT RND AUTOMATIC SOL SRL | RND AUTOMATIC SOL SRL | Municipiul Satu Mare | 10,330,725.00 | 6,223,497.61 | 1,098,264.29 | 3,008,963.10 | 6,809,785.47 | 17,140,510.47 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 312002 | 36 | Innovation in the production of pre-wired tubes - Efficiency and Performance | BEA & MAGDA SRL | The municipality of Cluj-Napoca | 5,737,749.22 | 3,028,540.42 | 534,448.31 | 2,174,760.49 | 1,442,231.46 | 7,179,980.68 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 306247 | 41 | Rehabilitation and modernization of roads in Țara Sylvania | UAT Sălaj County | Nușfalău | 296,368,642.81 | 251,913,346.38 | 38,547,823.50 | 5,907,472.93 | 120,947,405.80 | 417,316,048.61 | Signed contract | ||||||
PRNV/2023/622.A/1 | P6 | OS4.2 | 313339 | 14 | CONSTRUCTION AND EQUIPMENT OF 6 MODERN SCHOOL WORKSHOPS AT TECHNOLOGICAL HIGH SCHOOL NO. 1, CADEA | UAT Săcueni City | City of Săcueni | 11,186,100.94 | 5,593,050.47 | 5,369,328.46 | 223,722.01 | 0.00 | 11,186,100.94 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 316629 | 37 | ROBOTICS IN THE PRODUCTION OF ELECTRICAL CABLES | RCB ELECTRO 97 SA | Bistrita municipality | 5,054,273.98 | 2,688,179.72 | 474,384.66 | 1,891,709.60 | 1,127,423.60 | 6,181,697.58 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 316955 | 83 | "IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN BETFIA, SANMARTIN MUNICIPALITY, BIHOR COUNTY IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN CORDAU, SANMARTIN MUNICIPALITY, BIHOR COUNTY INFRASTRUCTURE IMPROVEMENT DAY THROUGH THE EXTENSION AND MODERNIZATION OF THE PARK IN THE LOCATION " | UAT SâNMARTIN MUNICIPALITY | Sânmartin | 23,561,515.06 | 20,027,287.80 | 3,062,996.96 | 471,230.30 | 345,321.91 | 23,906,836.97 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300445 | 62 | DEVELOPMENT OF GREEN SPACE IN THE LAC HOSTEZE AREA, TOWN OF TAUțII MĐHERĂUȘ, Maramureș County | UAT The City of Tăuții Magherăuș | Town of Tăuţii- Magherăus | 8,428,844.69 | 7,164,517.99 | 1,095,749.79 | 168,576.91 | 88,455.01 | 8,517,299.70 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 318456 | 81 | CONSTRUCTION OF A GREEN SPACE IN THE MUNICIPALITY OF NOJORID, Jud. Bihor | UAT Nojorid Commune | Nojorid | 15,666,333.32 | 13,316,383.32 | 2,036,623.33 | 313,326.67 | 0.00 | 15,666,333.32 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324092 | 70 | Revitalizarea spațiului pietonal din centrul istoric al Municipiului Turda, construire autobază și amenajare park and ride | UAT Turda Municipality | Turda municipality | 15,212,201.35 | 12,930,371.15 | 1,977,586.18 | 304,244.02 | 259,947.96 | 15,472,149.31 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324347 | 66 | Revitalizarea fizică, economică și socială a Orașului Săcueni | UAT Săcueni City | City of Săcueni | 2,009,103.41 | 1,707,737.90 | 261,183.48 | 40,182.03 | 2,116,151.16 | 4,125,254.57 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324158 | 84 | Modernizarea coridorului de mobilitate urbană integrată în zona de est a municipiului Turda | UAT Turda Municipality | Turda municipality | 20,353,178.43 | 17,300,201.66 | 2,645,913.20 | 407,063.57 | 24,205.04 | 20,377,383.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324376 | 67 | Creșterea performantei energetice a Spitalului Clinic Municipal Dr. Gavril Curteanu Oradea | UAT Oradea Municipality | Oradea municipality | 9,256,629.11 | 7,868,134.74 | 1,203,361.79 | 185,132.58 | 3,708,144.85 | 12,964,773.96 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324461 | 92 | Îmbunătățrea serviciilor educaționale și a spațiilor publice în Orașul Valea lui Mihai | UAT Valea lui Mihai city | Valea Lui Mihai city | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324161 | 46 | The regeneration of the Mihai Viteazu Obelisk area through the creation of a new public park in Turda Municipality | UAT Turda Municipality | Turda municipality | 2,359,116.09 | 2,005,248.08 | 306,685.07 | 47,182.34 | 9,817.50 | 2,369,933.59 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324407 | 64 | Modernization of the integrated urban mobility corridor in the western area of Turda Municipality | UAT Turda Municipality | Turda municipality | 14,138,350.57 | 12,017,597.98 | 1,837,985.57 | 282,767.02 | 13,105.84 | 14,151,456.41 | Signed contract | ||||||
PRNV/2024/713.Etap | Q7 | OS5.1 | 324492 | 56 | SOS (Village-Town-Resort) AQUA PRIMUS SINGEORZ-BAI | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 773,964.96 | 657,870.22 | 100,615.44 | 15,479.30 | 1,039,657.68 | 1,813,622.64 | Signed contract | ||||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324429 | 71 | Development of the Lac Stei recreation area | UAT City of Stei | City of Stei | 24/05/2024 | 212,284.42 | 180,441.76 | 27,596.97 | 4,245.69 | 229,884.61 | 442,169.03 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324411 | 79 | Amenajare piste de biciclete, pod rutier peste râul Someșul Mare și asfaltare străzi în orașul Sîngeorz Băi | UAT City of Sangeorz Bai | Oraş Sângeorz- Bă | 3,927,075.71 | 3,338,014.35 | 510,519.82 | 78,541.54 | 704,760.54 | 4,631,836.25 | Signed contract | ||||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324110 | Cercetarea, proiectarea și dezvoltarea vehiculelor electrice ecologice realizate din materiale compozite avansate, echipate cu panouri fotovoltaice și realizarea unei linii de asamblare în vederea obținerii produsului final | BELCO AVIA SRL | orchards | 24/05/2024 | 21,829,162.86 | 11,135,083.06 | 1,965,014.66 | 8,729,065.14 | 8,414,091.28 | 30,243,254.14 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324472 | 57 | Creation of the Carei Recreation Center | UAT Carei Municipality | The municipality of Carei | 21/05/2024 | 21/06/2024 | 5,019,836.73 | 4,266,861.22 | 652,578.76 | 100,396.75 | 13,934.90 | 5,033,771.63 | Signed contract | ||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324112 | 80 | Modernization of the integrated urban mobility corridor in the central area of Turda Municipality | UAT Turda Municipality | Turda municipality | 31/05/2024 | 10/07/2024 | 7,586,329.85 | 6,448,380.37 | 986,222.88 | 151,726.60 | 6,805.04 | 7,593,134.89 | Signed contract | ||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324387 | ÎNFIINȚARE PARC ȘTIINȚIFIC ȘI TEHNOLOGIC BIHOR - Etapa 2 | UAT Bihor County | Oradea municipality | 28/05/2024 | 23/07/2024 | 6,787,049.12 | 2,929,091.82 | 516,898.56 | 3,341,058.74 | 0.00 | 6,787,049.12 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324493 | 58 | Titlu Proiect: Creare Centru Multifunctional Carei | UAT Carei Municipality | The municipality of Carei | 23/05/2024 | 21/06/2024 | 8,556,798.11 | 7,273,278.39 | 1,112,383.74 | 171,135.98 | 3,411,797.85 | 11,968,595.96 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324170 | 69 | Construire Centru Social de Zi, Patinoar și Skate Park în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 15,720,248.36 | 13,363,211.11 | 2,043,632.28 | 314,404.97 | 0.00 | 15,720,248.36 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324180 | 68 | Construire grădinița în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzi | 6,337,950.65 | 3,168,975.32 | 3,042,216.32 | 126,759.01 | 1,095,550.51 | 7,433,501.16 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324556 | 42 | Creșterea gradului de participare la nivelul învățământului obligatoriu în cadrul Școlii gimnaziale nr.1 Carei | UAT Carei Municipality | The municipality of Carei | 20/05/2024 | 03/06/2024 | 3,365,186.95 | 1,682,593.47 | 1,615,289.74 | 67,303.74 | 427,597.55 | 3,792,784.50 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324124 | 52 | Revitalizare spații publice urbane, îmbunătățirea serviciilor sociale și cultural-recreative în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 6,090,487.83 | 5,176,914.66 | 791,763.43 | 121,809.74 | 5,047,411.38 | 11,137,899.21 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324125 | 48 | Revitalizare spații publice urbane, îmbunătățirea serviciilor educaționale și sociale în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 7,137,878.90 | 6,067,197.07 | 927,924.26 | 142,757.58 | 61,761.00 | 7,199,639.90 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324400 | 47 | Construire locuințe sociale în Municipiul Carei | UAT Carei Municipality | The municipality of Carei | 3,823,961.94 | 3,250,367.65 | 497,115.05 | 76,479.24 | 7,850.00 | 3,831,811.94 | Signed contract | ||||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324666 | Dezvoltarea Centrului de Tranfer Tehnologic al Universității din Oradea - Smart Industries - etapa II | ORADEA UNIVERSITY | Oradea municipality | 13,850,000.00 | 5,886,250.00 | 1,038,750.00 | 6,925,000.00 | 2,642,395.18 | 16,492,395.18 | Signed contract | |||||||
PRNV/2024/711.Etap | Q7 | OS5.1 | 324718 | 76 | Reabilitarea, modernizarea și dotarea Teatrului Aureliu Manea, Turda | UAT Turda Municipality | Turda municipality | 28/05/2024 | 21,631,351.46 | 18,386,648.74 | 2,812,075.69 | 432,627.03 | 0.00 | 21,631,351.46 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324127 | 86 | Improving the quality of life of the population by creating a multifunctional center and rehabilitating the central area of Baia Sprie | UAT City of Baia Sprie | City of Baia Sprie | 28/05/2024 | 8,390,900.26 | 7,132,265.22 | 1,090,817.01 | 167,818.03 | 9,996,105.20 | 18,387,005.46 | Signed contract | |||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324779 | Obținerea de produse farmaceutice și dermatocosmetice inovative având la bază substanțe active de sinteză în asociere cu extracte vegetale din plante, alge şi cianobacterii | SAPIENT SRL | Oradea municipality | 28/05/2024 | 56,407,636.97 | 34,543,357.53 | 6,095,886.62 | 15,768,392.82 | 21,401,607.72 | 77,809,244.69 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324531 | 87 | Amenajare Zona Cultural-Recreativă “Trei Lacuri” din Municipiul Câmpia Turzii | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 2,885,674.70 | 2,452,823.39 | 375,137.69 | 57,713.49 | 9,109,007.07 | 11,994,681.64 | Signed contract | ||||||
PRNV/2024/311.Etap | P3 | OS2.1 | 324340 | 82 | Creșterea eficienței energetice a blocurilor de locuințe în municipiul Baia Mare - CF 7 | UAT Baia Mare Municipality | Baia Mare municipality | 7,690,915.62 | 6,537,278.27 | 999,819.03 | 153,818.32 | 1,637,444.15 | 9,329,359.77 | Signed contract | ||||||
PRNV/2024/622.Etap | P6 | OS4.2 | 324236 | 93 | Dezvoltarea infrastructurii de educatie tehnologica prin modernizarea Colegiului Tehnic "Transilvania" din Municipiul Baia Mare - etapa II | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324931 | 60 | Restaurarea, conservarea și reabilitarea clădirii fostei Judecătorii (P-ța Republicii nr. 5) și redestinarea ei ca Centru de cultură, artă și tradiții | UAT Turda Municipality | Turda municipality | 13,150,110.47 | 11,177,593.90 | 1,709,514.36 | 263,002.21 | 0.00 | 13,150,110.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324140 | 89 | Cresterea eficientei energetice in cladirile publice din Municipiul Baia Mare-Spitalul de Pneumoftiziologie "Dr. Nicolae Rusdea" | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324515 | 74 | CENTRU MULTIFUNCȚIONAL RECREATIV MARGHITA | UAT Marghita Municipality | Marghita municipality | 12,428,309.61 | 10,564,063.17 | 1,615,680.26 | 248,566.19 | 8,526,001.96 | 20,954,311.57 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324159 | 77 | EXTINDERE, MANSARDARE, MODERNIZARE ȘI DOTARE ȘCOALA GIMNAZIALĂ NR. 1, GHERLA | UAT Gherla Municipality | The municipality of Gherla | 17,036,498.08 | 8,518,249.04 | 8,177,519.08 | 340,729.96 | 15,911,734.82 | 32,948,232.90 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324520 | 75 | Centru Educațional Multifuncțional ”Octavian Goga” | UAT Marghita Municipality | Marghita municipality | 6,453,909.86 | 3,226,954.93 | 3,097,876.74 | 129,078.19 | 9,245,321.60 | 15,699,231.46 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324396 | 63 | Reabilitare bloc de locuinte sociale strada Luminisului 13 A | UAT Baia Mare Municipality | Baia Mare municipality | 1,713,009.27 | 1,456,057.88 | 222,691.20 | 34,260.19 | 8,104,560.44 | 9,817,569.71 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324397 | 61 | Rehabilitation of social housing block, Horea street 46A | UAT Baia Mare Municipality | Baia Mare municipality | 3,125,543.30 | 2,656,711.81 | 406,320.63 | 62,510.87 | 8,821,170.06 | 11,946,713.36 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324557 | 88 | Reabilitarea, modernizarea și dotarea spațiilor Bibliotecii Municipale “Ioan Munteanu” pentru a crea un centru cultural-recreativ, modernizarea parcului central si realizarea culoarului pietonal de legătură în zona centrală pentru a integra zona cultural-socială centrală a municipiului | UAT Marghita Municipality | Marghita municipality | 28/05/2024 | 3,609,323.42 | 3,067,924.91 | 469,212.05 | 72,186.46 | 0.00 | 3,609,323.42 | Signed contract | |||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324361 | 90 | Transformarea zonei degradate malurile Somesului intre cele 2 poduri in zona de petrecere a timpului liber pentru comunitate | UAT Municipiul Satu Mare | Municipiul Satu Mare | 28/05/2024 | 7,973,696.80 | 6,777,642.28 | 1,036,580.58 | 159,473.94 | 1,157,455.66 | 9,131,152.46 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324086 | 85 | Modernizarea coridorului integrat de mobilitate urbană reprezentat de str. 1 Mai (tronson 1 Mai 182 - intersecție Str. Ion Pop Reteganu), Str. Ion Pop Rateganu - Pod Someș - Str. Libertății - Str. Bistriței până la limita administrativ teritorială a municipiului Dej, inclusiv acces către Autobaza TRANSURB Dej și modernizare Autobaza TRANSURB SA | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 11,428,422.50 | 9,714,159.13 | 1,485,694.93 | 228,568.45 | 2,522,574.35 | 13,950,996.85 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324100 | 53 | Increasing the quality of life of the population of Dej municipality by building and equipping the cultural-recreational center and improving urban public spaces in the Dealul Florilor neighborhood | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 8,893,820.17 | 7,559,747.14 | 1,156,196.63 | 177,876.40 | 0.00 | 8,893,820.17 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324118 | 72 | DEZVOLTAREA INFRASTRUCTURII DE TRANSPORT ALTERNATIV ÎN MUNICIPIUL DEJ - punte pietonală și modernizare coridor infrastructură integrată în Ocna Dej | UAT Municipality Dej | The municipality of Dej | 2,418,342.50 | 2,418,342.50 | 314,384.53 | 48,366.85 | 2,235,987.97 | 4,654,330.47 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324119 | 73 | Amenajarea zonei pietonale centrale în vederea reducerii emisiilor de carbon din zona centrală a municipiului Dej | UAT Municipality Dej | The municipality of Dej | 14,844,007.97 | 12,617,406.77 | 1,929,721.05 | 296,880.15 | 334,440.23 | 15,178,448.20 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324087 | 65 | Improvement of public and non-motorized transport in the municipality of Dej | UAT Municipality Dej | The municipality of Dej | 4,633,354.42 | 3,938,351.26 | 602,336.07 | 92,667.09 | 331,277.44 | 4,964,631.87 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324731 | 78 | Reabilitare, cresterea eficientei energetice, gestionarea eficienta a energiei la imobile existente, corpurile C2 si C20, modificari interioare, amenajari spatii de lucru in pod existent (C2) amenajare incinta si refacere imprejumuire la IPJ si DJI Cluj | POLICE INSPECTOR OF THE COUNTY. CLUJ | The municipality of Cluj-Napoca | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324120 | 50 | Creșterea calitatii vieții in municipiul Dej prin construirea si dotarea centrului social,recreativ si îmbunătăţirea spațiilor publice urbane din zona acestuia | UAT Municipality Dej | The municipality of Dej | 22,991,883.50 | 19,543,100.98 | 2,988,944.85 | 459,837.67 | 12,132,396.28 | 35,124,279.78 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324121 | 49 | Construirea unei clădiri cu destinaţia şcoală clasele V-VIII pentru Şcoala gimnazială nr.1 Dej | UAT Municipality Dej | The municipality of Dej | 2,831,340.65 | 1,415,670.33 | 1,359,043.52 | 56,626.80 | 1,332,427.94 | 4,163,768.59 | Signed contract |
Section being updated.
Status of signed contracts Priority 5
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
PRNV/2023/AT/1 | P8 | AT | 322335 | 1 | Support for ADR North-West, as the Management Authority, for the implementation of the North-West Regional Program in the North-West Development Region, in the period 2021-2023 | ADR North-West | The municipality of Cluj-Napoca | 37,066,098.44 | 31,506,183.68 | 5,559,914.76 | 0.00 | 0.00 | 37,066,098.44 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 300242 | 2 | Construction and rehabilitation of secondary road links to the road network and TEN-T nodes in Bihor County | UAT Bihor County | Salonta municipality | 23/12/2021 | 31/12/2027 | 297,827,999.75 | 253,153,799.79 | 38,717,639.96 | 5,956,560.00 | 334,843,791.40 | 632,671,791.15 | Signed contract | ||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300350 | 7 | Establishment and development of Tașnad Urban Garden | UAT Tașnad City | Satu Mare | The project proposes the establishment of an urban garden-type green space on a degraded and unused land, according to letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the urban areas. The location of the investment, free of above-ground constructions, is registered in the Register of green spaces as degraded land, according to extracts CF 101921, 101922. The Urban Garden is organized in three main areas: an area equipped with playgrounds for children, teenagers and young people, a area containing a basketball court bordered by a small natural amphitheater and 16 themed "grassland lounges". Three of these "lounges" are located in the active area of the Garden, where athletes and spectators can meet and spend time together. The others are hidden in the pre-existing deciduous forest, so the experience amounts to complete immersion in nature. | 24,515,127.70 | 20,837,858.54 | 3,186,966.59 | 490,302.57 | 778,052.79 | 25,293,180.49 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300351 | 6 | IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: DEVELOPING A PARK ON BERZEI STR. SANTANDREI MUNICIPALITY, BIHOR COUNTY, respectively DEVELOPING A PARK ON STRADA KLOPOTEILOR, SANTANDREI MUNICIPALITY, BIHOR COUNTY | UAT Commune of Santander | Santandrei | This project proposes the establishment of green spaces of the square type, in accordance with letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the rural areas of localities, because this area is degraded, unused land. The arrangement will be approached in an integrated manner and will be carried out on the basis of a complex specialized project aimed at improving the rural image, protecting biodiversity, developing connections and pedestrian movements, creating attractive recreation areas, organizing urban furniture and vegetation in accordance with the specifics of the area. The main purpose of the proposed works is to increase the quality of life of the residents of the adjacent neighborhood, it is desired that the park be an attractive space for all age groups, a space for both active and passive rest intended at the same time for sports, relaxation and walks. | 24,305,093.15 | 20,659,329.18 | 3,159,662.11 | 486,101.86 | 799,061.20 | 25,104,154.35 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300352 | 4 | Establishment and Development of the "Urban Garden Transilvania" Botanical Park | UAT Beclean City | Beclean city | The project aims to establish and arrange a new green space that will have an area of 41321 square meters. The basic investment will be made in the city of Beclean - Land Deed no. 30510 (land surface 41321 sqm), land located in the inner city. The proposed botanical park covers approximately 4 hectares and is part of the extended project of the Transilvania Urban Garden in the city of Beclean. The proposed park is divided into 4 main areas: 1. Relaxation area (mounded area - located in the southeast allowing people to interact with each other thanks to welcoming open spaces. 2. Buffer zone (dense vegetation) 3. Protected plantation (Romanian species on the verge of extinction - with grass plantation, it is proposed to restore and protect the fauna of the place.) 4. Noisy area (Sports activities). | 24,147,606.65 | 20,525,465.64 | 3,139,188.85 | 482,952.16 | 764,542.33 | 24,912,148.98 | Signed contract | |||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300542 | 5 | Increasing energy efficiency and rehabilitating the building located in Oradea, strada Republicii no. 35 | UAT Bihor County | Bihor | 04/12/2023 | 05/02/2024 | 23,147,275.27 | 19,675,183.97 | 3,009,145.79 | 462,945.51 | 24,912,535.70 | 48,059,810.97 | Signed contract | ||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300543 | 8 | Cresterea eficientei energetice si gestionarea Inteligenta a energiei in cladirile publice cu destinatie de unitati de invatamant – Liceul Teoretic German F. Schiller | UAT Oradea Municipality | Oradea municipality | 04/12/2023 | 22/02/2024 | 9,408,599.19 | 7,997,309.31 | 1,223,117.89 | 188,171.99 | 6,426,799.41 | 15,835,398.60 | Signed contract | ||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301378 | 23 | Increasing urban mobility in the city of Taşnad by creating the mobility corridor in the North-West direction | UAT Tașnad City | Taşnad city | 31,162,080.82 | 26,487,768.70 | 4,051,070.42 | 623,241.70 | 1,869,849.02 | 33,031,929.84 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301400 | 40 | CREATION OF BAIA SPRIE-CHIUZBAIA MOBILITY CORRIDOR | UAT City of Baia Sprie | City of Baia Sprie | 88,355,310.03 | 75,102,013.53 | 11,486,190.31 | 1,767,106.19 | 7,780,247.25 | 96,135,557.28 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301405 | 16 | GHERLA 2 MOBILITY CORRIDOR | UAT Gherla Municipality | The municipality of Gherla | 88,603,652.82 | 75,313,104.90 | 11,518,474.86 | 1,772,073.06 | 6,639,343.88 | 95,242,996.70 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301398 | 28 | URBAN MOBILITY CORRIDOR BY CREATING CYCLE PATHS AND PRIORITY CORRIDOR FOR ECOLOGICAL PUBLIC TRANSPORT. ROUTE I FROM EAST TO WEST AND ROUTE II FROM SOUTH TO WEST IN THE MUNICIPALITY OF SALONTA | UAT Salonta Municipality | Salonta municipality | 70,158,693.21 | 59,634,889.23 | 9,120,630.12 | 1,403,173.86 | 3,583,202.80 | 73,741,896.01 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301393 | 22 | GHERLA MOBILITY CORRIDOR 1 | UAT Gherla Municipality | The municipality of Gherla | 15/09/2023 | 80,722,235.10 | 68,613,899.83 | 10,493,890.56 | 1,614,444.71 | 5,957,524.32 | 86,679,759.42 | Signed contract | |||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301478 | 59 | Implementation of solutions to increase traffic safety on the county road network in Bihor County | UAT Bihor County | Bihor | 74,456,961.28 | 63,288,417.09 | 967,940,497.00 | 1,489,139.22 | 17,476,140.19 | 91,933,101.47 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301606 | 19 | ESTABLISHMENT OF ALESD INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Elected city | 21,560,796.36 | 7,330,670.76 | 1,293,647.78 | 12,936,477.82 | 958,021.90 | 22,518,818.26 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301609 | 27 | ESTABLISHMENT OF BEIUȘ INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Beiuş municipality | 23,698,193.84 | 8,057,385.90 | 1,421,891.63 | 14,218,916.31 | 20,431,236.79 | 44,129,430.63 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301612 | 29 | MARGHITA INTELLIGENT SPECIALIZATION PARK ESTABLISHMENT | UAT Bihor County | Marghita municipality | 24,223,222.05 | 8,578,475.68 | 1,513,848.65 | 14,130,897.72 | 6,492,484.27 | 30,715,706.32 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301602 | 20 | Baia Sprie Intelligence Specialization Park Development | UAT Maramureș County | City of Baia Sprie | 39,005,020.74 | 16,674,883.81 | 2,942,626.56 | 19,387,510.37 | 14,262,285.34 | 53,267,306.08 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301558 | 39 | Creation and development of the intelligent specialization park Somcuta Mare, Maramures county | UAT Maramureș County | Somcuţa Mare city | 30,303,946.90 | 13,101,456.68 | 2,312,021.77 | 14,890,468.45 | 2,840,964.92 | 33,144,911.82 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301604 | 44 | Targu Lapus Intelligence Specialization Park Development | UAT Maramureș County | Town of Târgu Lăpuş | 21,396,260.69 | 9,191,160.79 | 1,621,969.55 | 10,583,130.35 | 8,077,330.74 | 29,473,591.43 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301621 | 26 | ESTABLISHMENT OF INTELLIGENT SPECIALIZATION PARK STEI | UAT Bihor County | City of Stei | 27,140,000.34 | 9,373,519.73 | 1,654,150.54 | 16,112,330.07 | 578,460.18 | 27,718,460.52 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302122 | 21 | Rehabilitation of the municipal museum in Beius | UAT Beiuș Municipality | Beiuş municipality | 18,300,168.11 | 15,555,142.89 | 2,379,014.02 | 366,011.20 | 0.00 | 18,300,168.11 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302106 | 17 | Restoration of the Synagogue building | UAT City of Seini | Seini city | 10,856,606.58 | 9,228,115.59 | 1,411,358.82 | 217,132.17 | 1,359,161.60 | 12,215,768.18 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302121 | 3 | REHABILITATION, RESTORATION AND INTRODUCTION TO THE TOURIST CIRCUIT OF THE METROPOLITAN CATHEDRAL IN CLUJ NAPOCA | ARCHBISHOP OF VAD FELEACULI AND CLJUI | The municipality of Cluj-Napoca | 34,461,307.41 | 28,706,269.02 | 5,065,812.19 | 689,226.20 | 22,433,720.04 | 56,895,027.45 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302104 | 12 | Rehabilitation and enhancement of the Bathory Fortress Ensemble | UAT Simleu City of Silvania | City of Simleu Silvaniei | 34,746,496.03 | 29,534,521.63 | 4,517,044.48 | 694,929.92 | 3,058,149.36 | 37,804,645.39 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302040 | 33 | REHABILITATION AND RESTRUCTURING BUILDING C1 AND BUILDING C3, CHANGE OF DESTINATION OF BUILDING C1 FROM PARISH HOUSE TO CULTURAL FUNCTIONS AND INTRODUCING THE HOLY TRINITY COMPLEX IN CLUJ-NAPOCA INTO THE TOURIST CIRCUIT, EXTERIOR ARRANGEMENTS AND SITE ORGANIZATION | Holy Trinity Romanian Orthodox Parish | The municipality of Cluj-Napoca | 10,857,386.54 | 9,044,202.95 | 1,596,035.82 | 217,147.77 | 10,504,921.08 | 21,362,307.62 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302105 | 25 | Dezvoltarea Integrată și Durabilă a Patrimoniului și Turismului Cultural în Municipiul Carei – Complex Castel Karolyi și Parc Dendrologic – Etapa a II-a | UAT Carei Municipality | The municipality of Carei | 34,746,599.99 | 29,534,609.99 | 4,517,058.00 | 694,932.00 | 5,382,706.92 | 40,129,306.91 | Signed contract | ||||||
PRNV/2023/721/1 | Q7 | OS5.2 | 302216 | 51 | Rehabilitation and capitalization in the tourist circuit of the Geza Teleki Castle in the town of Pribilesti | UAT Maramureș County | satulung | 33,578,647.64 | 28,541,850.49 | 4,365,224.20 | 671,572.95 | 27,597,632.29 | 61,176,279.93 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 302109 | 18 | Rehabilitation of Juhasz Gyula High School | UAT Oradea Municipality | Oradea municipality | 18/01/2024 | 05/04/2024 | 10,678,279.72 | 9,076,537.76 | 1,388,176.35 | 213,565.61 | 762,366.13 | 11,440,645.85 | Signed contract | ||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303539 | 45 | SLOW MOBILITY CORRIDOR - CRASNA RIVER BEACH IN THE CITY OF SIMLEU SILVANIEI | UAT Simleu City of Silvania | City of Simleu Silvaniei | 23,203,284.82 | 19,722,792.10 | 3,016,427.02 | 464,065.70 | 0.00 | 23,203,284.82 | Signed contract | ||||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303536 | 54 | Urban regeneration in the City of Sângeorz-Băi | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 14,081,054.24 | 11,968,896.10 | 1,830,537.05 | 281,621.09 | 506,075.56 | 14,587,129.80 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300583 | 32 | Energy rehabilitation for the A building of the Clinical Recovery Hospital Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 16,253,989.49 | 13,815,891.07 | 2,113,018.62 | 325,079.80 | 779,049.74 | 17,033,039.23 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300584 | 31 | Thermal rehabilitation and energy efficiency of the Clinical Hospital for Infectious Diseases Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 18/01/2024 | 20/05/2024 | 34,576,087.68 | 29,389,674.53 | 4,494,891.37 | 691,521.78 | 4,630,256.24 | 39,206,343.92 | Signed contract | ||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301724 | 24 | Development of uneven intersection between DJ 767M and DC 44 in order to increase traffic safety | UAT Bihor County | OSORHEI | 55,474,413.26 | 47,153,251.27 | 7,211,673.73 | 1,109,488.26 | 6,729,742.25 | 62,204,153.51 | Signed contract | ||||||
PRNV/2023/522.B/1 | P5 | OS3.2 | 303552 | 9 | Equipment for increasing traffic safety in Cluj county | UAT Cluj County | AGHIRESU | 18/03/2024 | 5,121,216.66 | 4,353,034.16 | 665,758.16 | 102,424.34 | 0.00 | 5,121,216.66 | Signed contract | |||||
PRNV/2023/623/1 | P6 | OS4.2 | 304325 | 10 | Modernization and rehabilitation of the educational structure Anatomie Building, str. Clinicilor no. 3-5, Cluj-Napoca | UNIVERSITY OF MEDICINE AND PHARMACY, IULIU HATIEGANU"" CLUJ NAPOCA | The municipality of Cluj-Napoca | 32,543,279.99 | 16,271,640.00 | 15,620,774.39 | 650,865.60 | 23,446,644.17 | 55,989,924.16 | Signed contract | ||||||
PRNV/2023/623/1 | P6 | OS4.2 | 304328 | 15 | The development of the educational infrastructure of the Technical University of Cluj-Napoca by rehabilitating and equipping CORP C1 Str. Observatory, no. 2, Cluj-Napoca municipality" | TECHNICAL UNIVERSITY OF CLUJ NAPOCA | The municipality of Cluj-Napoca | 05/12/2023 | 02/04/2024 | 32,517,074.29 | 16,258,537.15 | 15,608,195.65 | 650,341.49 | 503,085.16 | 33,020,159.45 | Signed contract | ||||
PRNV/2023/623/1 | P6 | OS4.2 | 304295 | 11 | Modernization of the educational infrastructure for the students of the Faculty of Medicine and Pharmacy - building C2, campus III | ORADEA UNIVERSITY | Oradea municipality | 10,126,102.68 | 5,063,051.37 | 4,860,529.25 | 202,522.06 | 0.00 | 10,126,102.68 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305885 | 34 | Building building (1-2S)+P+E+R/M with medical clinic destination | OSTEOPROTECT SRL | Oradea municipality | 15,883,278.23 | 6,286,765.74 | 1,109,429.25 | 8,487,083.24 | 682,971.53 | 16,566,249.76 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305883 | 38 | Construction and equipment of a recovery center with S+P+E+M height regime in Ardud Vii locality, Satu Mare county | VITAL CLINIQUE SRL | Oraş Ardud | 10,108,639.92 | 6,212,817.96 | 1,096,379.64 | 2,799,442.32 | 7,903,024.30 | 18,011,664.22 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305886 | 35 | Increasing the competitiveness of the Medimage clinic by diversifying medical services | MEDIMAGES SRL | The municipality of Cluj-Napoca | 11,144,167.60 | 5,863,167.88 | 1,034,676.68 | 4,246,323.04 | 0.00 | 11,144,167.60 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309660 | 13 | Intelligent production: automations and innovations | FLACARA IMPEX SRL | Bistrita municipality | 4,549,805.21 | 2,763,489.09 | 487,674.55 | 2,178,261.66 | 879,260.09 | 5,429,425.30 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309132 | 30 | INCREASING THE COMPETITIVENESS OF FEMARIS SRL THROUGH THE CONSTRUCTION OF A PRODUCTION HALL AND EQUIPPED WITH PERFORMING EQUIPMENT | FEMARIS SRL | OSORHEI | 6,415,176.25 | 3,445,583.15 | 608,044.09 | 2,361,549.01 | 1,206,243.09 | 7,621,419.34 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310555 | 43 | Advanced technologies in equipment production | INOTEC SRL | The municipality of Cluj-Napoca | 2,284,107.57 | 1,032,370.71 | 182,183.07 | 1,069,553.79 | 652,874.83 | 2,936,982.40 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310437 | 55 | INCREASING COMPETITIVENESS AT RND AUTOMATIC SOL SRL | RND AUTOMATIC SOL SRL | Municipiul Satu Mare | 10,330,725.00 | 6,223,497.61 | 1,098,264.29 | 3,008,963.10 | 6,809,785.47 | 17,140,510.47 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 312002 | 36 | Innovation in the production of pre-wired tubes - Efficiency and Performance | BEA & MAGDA SRL | The municipality of Cluj-Napoca | 5,737,749.22 | 3,028,540.42 | 534,448.31 | 2,174,760.49 | 1,442,231.46 | 7,179,980.68 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 306247 | 41 | Rehabilitation and modernization of roads in Țara Sylvania | UAT Sălaj County | Nușfalău | 296,368,642.81 | 251,913,346.38 | 38,547,823.50 | 5,907,472.93 | 120,947,405.80 | 417,316,048.61 | Signed contract | ||||||
PRNV/2023/622.A/1 | P6 | OS4.2 | 313339 | 14 | CONSTRUCTION AND EQUIPMENT OF 6 MODERN SCHOOL WORKSHOPS AT TECHNOLOGICAL HIGH SCHOOL NO. 1, CADEA | UAT Săcueni City | City of Săcueni | 11,186,100.94 | 5,593,050.47 | 5,369,328.46 | 223,722.01 | 0.00 | 11,186,100.94 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 316629 | 37 | ROBOTICS IN THE PRODUCTION OF ELECTRICAL CABLES | RCB ELECTRO 97 SA | Bistrita municipality | 5,054,273.98 | 2,688,179.72 | 474,384.66 | 1,891,709.60 | 1,127,423.60 | 6,181,697.58 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 316955 | 83 | "IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN BETFIA, SANMARTIN MUNICIPALITY, BIHOR COUNTY IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN CORDAU, SANMARTIN MUNICIPALITY, BIHOR COUNTY INFRASTRUCTURE IMPROVEMENT DAY THROUGH THE EXTENSION AND MODERNIZATION OF THE PARK IN THE LOCATION " | UAT SâNMARTIN MUNICIPALITY | Sânmartin | 23,561,515.06 | 20,027,287.80 | 3,062,996.96 | 471,230.30 | 345,321.91 | 23,906,836.97 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300445 | 62 | DEVELOPMENT OF GREEN SPACE IN THE LAC HOSTEZE AREA, TOWN OF TAUțII MĐHERĂUȘ, Maramureș County | UAT The City of Tăuții Magherăuș | Town of Tăuţii- Magherăus | 8,428,844.69 | 7,164,517.99 | 1,095,749.79 | 168,576.91 | 88,455.01 | 8,517,299.70 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 318456 | 81 | CONSTRUCTION OF A GREEN SPACE IN THE MUNICIPALITY OF NOJORID, Jud. Bihor | UAT Nojorid Commune | Nojorid | 15,666,333.32 | 13,316,383.32 | 2,036,623.33 | 313,326.67 | 0.00 | 15,666,333.32 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324092 | 70 | Revitalizarea spațiului pietonal din centrul istoric al Municipiului Turda, construire autobază și amenajare park and ride | UAT Turda Municipality | Turda municipality | 15,212,201.35 | 12,930,371.15 | 1,977,586.18 | 304,244.02 | 259,947.96 | 15,472,149.31 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324347 | 66 | Revitalizarea fizică, economică și socială a Orașului Săcueni | UAT Săcueni City | City of Săcueni | 2,009,103.41 | 1,707,737.90 | 261,183.48 | 40,182.03 | 2,116,151.16 | 4,125,254.57 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324158 | 84 | Modernizarea coridorului de mobilitate urbană integrată în zona de est a municipiului Turda | UAT Turda Municipality | Turda municipality | 20,353,178.43 | 17,300,201.66 | 2,645,913.20 | 407,063.57 | 24,205.04 | 20,377,383.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324376 | 67 | Creșterea performantei energetice a Spitalului Clinic Municipal Dr. Gavril Curteanu Oradea | UAT Oradea Municipality | Oradea municipality | 9,256,629.11 | 7,868,134.74 | 1,203,361.79 | 185,132.58 | 3,708,144.85 | 12,964,773.96 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324461 | 92 | Îmbunătățrea serviciilor educaționale și a spațiilor publice în Orașul Valea lui Mihai | UAT Valea lui Mihai city | Valea Lui Mihai city | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324161 | 46 | The regeneration of the Mihai Viteazu Obelisk area through the creation of a new public park in Turda Municipality | UAT Turda Municipality | Turda municipality | 2,359,116.09 | 2,005,248.08 | 306,685.07 | 47,182.34 | 9,817.50 | 2,369,933.59 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324407 | 64 | Modernization of the integrated urban mobility corridor in the western area of Turda Municipality | UAT Turda Municipality | Turda municipality | 14,138,350.57 | 12,017,597.98 | 1,837,985.57 | 282,767.02 | 13,105.84 | 14,151,456.41 | Signed contract | ||||||
PRNV/2024/713.Etap | Q7 | OS5.1 | 324492 | 56 | SOS (Village-Town-Resort) AQUA PRIMUS SINGEORZ-BAI | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 773,964.96 | 657,870.22 | 100,615.44 | 15,479.30 | 1,039,657.68 | 1,813,622.64 | Signed contract | ||||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324429 | 71 | Development of the Lac Stei recreation area | UAT City of Stei | City of Stei | 24/05/2024 | 212,284.42 | 180,441.76 | 27,596.97 | 4,245.69 | 229,884.61 | 442,169.03 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324411 | 79 | Amenajare piste de biciclete, pod rutier peste râul Someșul Mare și asfaltare străzi în orașul Sîngeorz Băi | UAT City of Sangeorz Bai | Oraş Sângeorz- Bă | 3,927,075.71 | 3,338,014.35 | 510,519.82 | 78,541.54 | 704,760.54 | 4,631,836.25 | Signed contract | ||||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324110 | Cercetarea, proiectarea și dezvoltarea vehiculelor electrice ecologice realizate din materiale compozite avansate, echipate cu panouri fotovoltaice și realizarea unei linii de asamblare în vederea obținerii produsului final | BELCO AVIA SRL | orchards | 24/05/2024 | 21,829,162.86 | 11,135,083.06 | 1,965,014.66 | 8,729,065.14 | 8,414,091.28 | 30,243,254.14 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324472 | 57 | Creation of the Carei Recreation Center | UAT Carei Municipality | The municipality of Carei | 21/05/2024 | 21/06/2024 | 5,019,836.73 | 4,266,861.22 | 652,578.76 | 100,396.75 | 13,934.90 | 5,033,771.63 | Signed contract | ||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324112 | 80 | Modernization of the integrated urban mobility corridor in the central area of Turda Municipality | UAT Turda Municipality | Turda municipality | 31/05/2024 | 10/07/2024 | 7,586,329.85 | 6,448,380.37 | 986,222.88 | 151,726.60 | 6,805.04 | 7,593,134.89 | Signed contract | ||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324387 | ÎNFIINȚARE PARC ȘTIINȚIFIC ȘI TEHNOLOGIC BIHOR - Etapa 2 | UAT Bihor County | Oradea municipality | 28/05/2024 | 23/07/2024 | 6,787,049.12 | 2,929,091.82 | 516,898.56 | 3,341,058.74 | 0.00 | 6,787,049.12 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324493 | 58 | Titlu Proiect: Creare Centru Multifunctional Carei | UAT Carei Municipality | The municipality of Carei | 23/05/2024 | 21/06/2024 | 8,556,798.11 | 7,273,278.39 | 1,112,383.74 | 171,135.98 | 3,411,797.85 | 11,968,595.96 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324170 | 69 | Construire Centru Social de Zi, Patinoar și Skate Park în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 15,720,248.36 | 13,363,211.11 | 2,043,632.28 | 314,404.97 | 0.00 | 15,720,248.36 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324180 | 68 | Construire grădinița în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzi | 6,337,950.65 | 3,168,975.32 | 3,042,216.32 | 126,759.01 | 1,095,550.51 | 7,433,501.16 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324556 | 42 | Creșterea gradului de participare la nivelul învățământului obligatoriu în cadrul Școlii gimnaziale nr.1 Carei | UAT Carei Municipality | The municipality of Carei | 20/05/2024 | 03/06/2024 | 3,365,186.95 | 1,682,593.47 | 1,615,289.74 | 67,303.74 | 427,597.55 | 3,792,784.50 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324124 | 52 | Revitalizare spații publice urbane, îmbunătățirea serviciilor sociale și cultural-recreative în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 6,090,487.83 | 5,176,914.66 | 791,763.43 | 121,809.74 | 5,047,411.38 | 11,137,899.21 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324125 | 48 | Revitalizare spații publice urbane, îmbunătățirea serviciilor educaționale și sociale în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 7,137,878.90 | 6,067,197.07 | 927,924.26 | 142,757.58 | 61,761.00 | 7,199,639.90 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324400 | 47 | Construire locuințe sociale în Municipiul Carei | UAT Carei Municipality | The municipality of Carei | 3,823,961.94 | 3,250,367.65 | 497,115.05 | 76,479.24 | 7,850.00 | 3,831,811.94 | Signed contract | ||||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324666 | Dezvoltarea Centrului de Tranfer Tehnologic al Universității din Oradea - Smart Industries - etapa II | ORADEA UNIVERSITY | Oradea municipality | 13,850,000.00 | 5,886,250.00 | 1,038,750.00 | 6,925,000.00 | 2,642,395.18 | 16,492,395.18 | Signed contract | |||||||
PRNV/2024/711.Etap | Q7 | OS5.1 | 324718 | 76 | Reabilitarea, modernizarea și dotarea Teatrului Aureliu Manea, Turda | UAT Turda Municipality | Turda municipality | 28/05/2024 | 21,631,351.46 | 18,386,648.74 | 2,812,075.69 | 432,627.03 | 0.00 | 21,631,351.46 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324127 | 86 | Improving the quality of life of the population by creating a multifunctional center and rehabilitating the central area of Baia Sprie | UAT City of Baia Sprie | City of Baia Sprie | 28/05/2024 | 8,390,900.26 | 7,132,265.22 | 1,090,817.01 | 167,818.03 | 9,996,105.20 | 18,387,005.46 | Signed contract | |||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324779 | Obținerea de produse farmaceutice și dermatocosmetice inovative având la bază substanțe active de sinteză în asociere cu extracte vegetale din plante, alge şi cianobacterii | SAPIENT SRL | Oradea municipality | 28/05/2024 | 56,407,636.97 | 34,543,357.53 | 6,095,886.62 | 15,768,392.82 | 21,401,607.72 | 77,809,244.69 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324531 | 87 | Amenajare Zona Cultural-Recreativă “Trei Lacuri” din Municipiul Câmpia Turzii | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 2,885,674.70 | 2,452,823.39 | 375,137.69 | 57,713.49 | 9,109,007.07 | 11,994,681.64 | Signed contract | ||||||
PRNV/2024/311.Etap | P3 | OS2.1 | 324340 | 82 | Creșterea eficienței energetice a blocurilor de locuințe în municipiul Baia Mare - CF 7 | UAT Baia Mare Municipality | Baia Mare municipality | 7,690,915.62 | 6,537,278.27 | 999,819.03 | 153,818.32 | 1,637,444.15 | 9,329,359.77 | Signed contract | ||||||
PRNV/2024/622.Etap | P6 | OS4.2 | 324236 | 93 | Dezvoltarea infrastructurii de educatie tehnologica prin modernizarea Colegiului Tehnic "Transilvania" din Municipiul Baia Mare - etapa II | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324931 | 60 | Restaurarea, conservarea și reabilitarea clădirii fostei Judecătorii (P-ța Republicii nr. 5) și redestinarea ei ca Centru de cultură, artă și tradiții | UAT Turda Municipality | Turda municipality | 13,150,110.47 | 11,177,593.90 | 1,709,514.36 | 263,002.21 | 0.00 | 13,150,110.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324140 | 89 | Cresterea eficientei energetice in cladirile publice din Municipiul Baia Mare-Spitalul de Pneumoftiziologie "Dr. Nicolae Rusdea" | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324515 | 74 | CENTRU MULTIFUNCȚIONAL RECREATIV MARGHITA | UAT Marghita Municipality | Marghita municipality | 12,428,309.61 | 10,564,063.17 | 1,615,680.26 | 248,566.19 | 8,526,001.96 | 20,954,311.57 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324159 | 77 | EXTINDERE, MANSARDARE, MODERNIZARE ȘI DOTARE ȘCOALA GIMNAZIALĂ NR. 1, GHERLA | UAT Gherla Municipality | The municipality of Gherla | 17,036,498.08 | 8,518,249.04 | 8,177,519.08 | 340,729.96 | 15,911,734.82 | 32,948,232.90 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324520 | 75 | Centru Educațional Multifuncțional ”Octavian Goga” | UAT Marghita Municipality | Marghita municipality | 6,453,909.86 | 3,226,954.93 | 3,097,876.74 | 129,078.19 | 9,245,321.60 | 15,699,231.46 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324396 | 63 | Reabilitare bloc de locuinte sociale strada Luminisului 13 A | UAT Baia Mare Municipality | Baia Mare municipality | 1,713,009.27 | 1,456,057.88 | 222,691.20 | 34,260.19 | 8,104,560.44 | 9,817,569.71 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324397 | 61 | Rehabilitation of social housing block, Horea street 46A | UAT Baia Mare Municipality | Baia Mare municipality | 3,125,543.30 | 2,656,711.81 | 406,320.63 | 62,510.87 | 8,821,170.06 | 11,946,713.36 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324557 | 88 | Reabilitarea, modernizarea și dotarea spațiilor Bibliotecii Municipale “Ioan Munteanu” pentru a crea un centru cultural-recreativ, modernizarea parcului central si realizarea culoarului pietonal de legătură în zona centrală pentru a integra zona cultural-socială centrală a municipiului | UAT Marghita Municipality | Marghita municipality | 28/05/2024 | 3,609,323.42 | 3,067,924.91 | 469,212.05 | 72,186.46 | 0.00 | 3,609,323.42 | Signed contract | |||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324361 | 90 | Transformarea zonei degradate malurile Somesului intre cele 2 poduri in zona de petrecere a timpului liber pentru comunitate | UAT Municipiul Satu Mare | Municipiul Satu Mare | 28/05/2024 | 7,973,696.80 | 6,777,642.28 | 1,036,580.58 | 159,473.94 | 1,157,455.66 | 9,131,152.46 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324086 | 85 | Modernizarea coridorului integrat de mobilitate urbană reprezentat de str. 1 Mai (tronson 1 Mai 182 - intersecție Str. Ion Pop Reteganu), Str. Ion Pop Rateganu - Pod Someș - Str. Libertății - Str. Bistriței până la limita administrativ teritorială a municipiului Dej, inclusiv acces către Autobaza TRANSURB Dej și modernizare Autobaza TRANSURB SA | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 11,428,422.50 | 9,714,159.13 | 1,485,694.93 | 228,568.45 | 2,522,574.35 | 13,950,996.85 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324100 | 53 | Increasing the quality of life of the population of Dej municipality by building and equipping the cultural-recreational center and improving urban public spaces in the Dealul Florilor neighborhood | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 8,893,820.17 | 7,559,747.14 | 1,156,196.63 | 177,876.40 | 0.00 | 8,893,820.17 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324118 | 72 | DEZVOLTAREA INFRASTRUCTURII DE TRANSPORT ALTERNATIV ÎN MUNICIPIUL DEJ - punte pietonală și modernizare coridor infrastructură integrată în Ocna Dej | UAT Municipality Dej | The municipality of Dej | 2,418,342.50 | 2,418,342.50 | 314,384.53 | 48,366.85 | 2,235,987.97 | 4,654,330.47 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324119 | 73 | Amenajarea zonei pietonale centrale în vederea reducerii emisiilor de carbon din zona centrală a municipiului Dej | UAT Municipality Dej | The municipality of Dej | 14,844,007.97 | 12,617,406.77 | 1,929,721.05 | 296,880.15 | 334,440.23 | 15,178,448.20 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324087 | 65 | Improvement of public and non-motorized transport in the municipality of Dej | UAT Municipality Dej | The municipality of Dej | 4,633,354.42 | 3,938,351.26 | 602,336.07 | 92,667.09 | 331,277.44 | 4,964,631.87 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324731 | 78 | Reabilitare, cresterea eficientei energetice, gestionarea eficienta a energiei la imobile existente, corpurile C2 si C20, modificari interioare, amenajari spatii de lucru in pod existent (C2) amenajare incinta si refacere imprejumuire la IPJ si DJI Cluj | POLICE INSPECTOR OF THE COUNTY. CLUJ | The municipality of Cluj-Napoca | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324120 | 50 | Creșterea calitatii vieții in municipiul Dej prin construirea si dotarea centrului social,recreativ si îmbunătăţirea spațiilor publice urbane din zona acestuia | UAT Municipality Dej | The municipality of Dej | 22,991,883.50 | 19,543,100.98 | 2,988,944.85 | 459,837.67 | 12,132,396.28 | 35,124,279.78 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324121 | 49 | Construirea unei clădiri cu destinaţia şcoală clasele V-VIII pentru Şcoala gimnazială nr.1 Dej | UAT Municipality Dej | The municipality of Dej | 2,831,340.65 | 1,415,670.33 | 1,359,043.52 | 56,626.80 | 1,332,427.94 | 4,163,768.59 | Signed contract |
Section being updated.
Status of signed contracts Priority 7
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
PRNV/2023/AT/1 | P8 | AT | 322335 | 1 | Support for ADR North-West, as the Management Authority, for the implementation of the North-West Regional Program in the North-West Development Region, in the period 2021-2023 | ADR North-West | The municipality of Cluj-Napoca | 37,066,098.44 | 31,506,183.68 | 5,559,914.76 | 0.00 | 0.00 | 37,066,098.44 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 300242 | 2 | Construction and rehabilitation of secondary road links to the road network and TEN-T nodes in Bihor County | UAT Bihor County | Salonta municipality | 23/12/2021 | 31/12/2027 | 297,827,999.75 | 253,153,799.79 | 38,717,639.96 | 5,956,560.00 | 334,843,791.40 | 632,671,791.15 | Signed contract | ||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300350 | 7 | Establishment and development of Tașnad Urban Garden | UAT Tașnad City | Satu Mare | The project proposes the establishment of an urban garden-type green space on a degraded and unused land, according to letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the urban areas. The location of the investment, free of above-ground constructions, is registered in the Register of green spaces as degraded land, according to extracts CF 101921, 101922. The Urban Garden is organized in three main areas: an area equipped with playgrounds for children, teenagers and young people, a area containing a basketball court bordered by a small natural amphitheater and 16 themed "grassland lounges". Three of these "lounges" are located in the active area of the Garden, where athletes and spectators can meet and spend time together. The others are hidden in the pre-existing deciduous forest, so the experience amounts to complete immersion in nature. | 24,515,127.70 | 20,837,858.54 | 3,186,966.59 | 490,302.57 | 778,052.79 | 25,293,180.49 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300351 | 6 | IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: DEVELOPING A PARK ON BERZEI STR. SANTANDREI MUNICIPALITY, BIHOR COUNTY, respectively DEVELOPING A PARK ON STRADA KLOPOTEILOR, SANTANDREI MUNICIPALITY, BIHOR COUNTY | UAT Commune of Santander | Santandrei | This project proposes the establishment of green spaces of the square type, in accordance with letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the rural areas of localities, because this area is degraded, unused land. The arrangement will be approached in an integrated manner and will be carried out on the basis of a complex specialized project aimed at improving the rural image, protecting biodiversity, developing connections and pedestrian movements, creating attractive recreation areas, organizing urban furniture and vegetation in accordance with the specifics of the area. The main purpose of the proposed works is to increase the quality of life of the residents of the adjacent neighborhood, it is desired that the park be an attractive space for all age groups, a space for both active and passive rest intended at the same time for sports, relaxation and walks. | 24,305,093.15 | 20,659,329.18 | 3,159,662.11 | 486,101.86 | 799,061.20 | 25,104,154.35 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300352 | 4 | Establishment and Development of the "Urban Garden Transilvania" Botanical Park | UAT Beclean City | Beclean city | The project aims to establish and arrange a new green space that will have an area of 41321 square meters. The basic investment will be made in the city of Beclean - Land Deed no. 30510 (land surface 41321 sqm), land located in the inner city. The proposed botanical park covers approximately 4 hectares and is part of the extended project of the Transilvania Urban Garden in the city of Beclean. The proposed park is divided into 4 main areas: 1. Relaxation area (mounded area - located in the southeast allowing people to interact with each other thanks to welcoming open spaces. 2. Buffer zone (dense vegetation) 3. Protected plantation (Romanian species on the verge of extinction - with grass plantation, it is proposed to restore and protect the fauna of the place.) 4. Noisy area (Sports activities). | 24,147,606.65 | 20,525,465.64 | 3,139,188.85 | 482,952.16 | 764,542.33 | 24,912,148.98 | Signed contract | |||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300542 | 5 | Increasing energy efficiency and rehabilitating the building located in Oradea, strada Republicii no. 35 | UAT Bihor County | Bihor | 04/12/2023 | 05/02/2024 | 23,147,275.27 | 19,675,183.97 | 3,009,145.79 | 462,945.51 | 24,912,535.70 | 48,059,810.97 | Signed contract | ||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300543 | 8 | Cresterea eficientei energetice si gestionarea Inteligenta a energiei in cladirile publice cu destinatie de unitati de invatamant – Liceul Teoretic German F. Schiller | UAT Oradea Municipality | Oradea municipality | 04/12/2023 | 22/02/2024 | 9,408,599.19 | 7,997,309.31 | 1,223,117.89 | 188,171.99 | 6,426,799.41 | 15,835,398.60 | Signed contract | ||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301378 | 23 | Increasing urban mobility in the city of Taşnad by creating the mobility corridor in the North-West direction | UAT Tașnad City | Taşnad city | 31,162,080.82 | 26,487,768.70 | 4,051,070.42 | 623,241.70 | 1,869,849.02 | 33,031,929.84 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301400 | 40 | CREATION OF BAIA SPRIE-CHIUZBAIA MOBILITY CORRIDOR | UAT City of Baia Sprie | City of Baia Sprie | 88,355,310.03 | 75,102,013.53 | 11,486,190.31 | 1,767,106.19 | 7,780,247.25 | 96,135,557.28 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301405 | 16 | GHERLA 2 MOBILITY CORRIDOR | UAT Gherla Municipality | The municipality of Gherla | 88,603,652.82 | 75,313,104.90 | 11,518,474.86 | 1,772,073.06 | 6,639,343.88 | 95,242,996.70 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301398 | 28 | URBAN MOBILITY CORRIDOR BY CREATING CYCLE PATHS AND PRIORITY CORRIDOR FOR ECOLOGICAL PUBLIC TRANSPORT. ROUTE I FROM EAST TO WEST AND ROUTE II FROM SOUTH TO WEST IN THE MUNICIPALITY OF SALONTA | UAT Salonta Municipality | Salonta municipality | 70,158,693.21 | 59,634,889.23 | 9,120,630.12 | 1,403,173.86 | 3,583,202.80 | 73,741,896.01 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301393 | 22 | GHERLA MOBILITY CORRIDOR 1 | UAT Gherla Municipality | The municipality of Gherla | 15/09/2023 | 80,722,235.10 | 68,613,899.83 | 10,493,890.56 | 1,614,444.71 | 5,957,524.32 | 86,679,759.42 | Signed contract | |||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301478 | 59 | Implementation of solutions to increase traffic safety on the county road network in Bihor County | UAT Bihor County | Bihor | 74,456,961.28 | 63,288,417.09 | 967,940,497.00 | 1,489,139.22 | 17,476,140.19 | 91,933,101.47 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301606 | 19 | ESTABLISHMENT OF ALESD INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Elected city | 21,560,796.36 | 7,330,670.76 | 1,293,647.78 | 12,936,477.82 | 958,021.90 | 22,518,818.26 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301609 | 27 | ESTABLISHMENT OF BEIUȘ INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Beiuş municipality | 23,698,193.84 | 8,057,385.90 | 1,421,891.63 | 14,218,916.31 | 20,431,236.79 | 44,129,430.63 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301612 | 29 | MARGHITA INTELLIGENT SPECIALIZATION PARK ESTABLISHMENT | UAT Bihor County | Marghita municipality | 24,223,222.05 | 8,578,475.68 | 1,513,848.65 | 14,130,897.72 | 6,492,484.27 | 30,715,706.32 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301602 | 20 | Baia Sprie Intelligence Specialization Park Development | UAT Maramureș County | City of Baia Sprie | 39,005,020.74 | 16,674,883.81 | 2,942,626.56 | 19,387,510.37 | 14,262,285.34 | 53,267,306.08 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301558 | 39 | Creation and development of the intelligent specialization park Somcuta Mare, Maramures county | UAT Maramureș County | Somcuţa Mare city | 30,303,946.90 | 13,101,456.68 | 2,312,021.77 | 14,890,468.45 | 2,840,964.92 | 33,144,911.82 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301604 | 44 | Targu Lapus Intelligence Specialization Park Development | UAT Maramureș County | Town of Târgu Lăpuş | 21,396,260.69 | 9,191,160.79 | 1,621,969.55 | 10,583,130.35 | 8,077,330.74 | 29,473,591.43 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301621 | 26 | ESTABLISHMENT OF INTELLIGENT SPECIALIZATION PARK STEI | UAT Bihor County | City of Stei | 27,140,000.34 | 9,373,519.73 | 1,654,150.54 | 16,112,330.07 | 578,460.18 | 27,718,460.52 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302122 | 21 | Rehabilitation of the municipal museum in Beius | UAT Beiuș Municipality | Beiuş municipality | 18,300,168.11 | 15,555,142.89 | 2,379,014.02 | 366,011.20 | 0.00 | 18,300,168.11 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302106 | 17 | Restoration of the Synagogue building | UAT City of Seini | Seini city | 10,856,606.58 | 9,228,115.59 | 1,411,358.82 | 217,132.17 | 1,359,161.60 | 12,215,768.18 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302121 | 3 | REHABILITATION, RESTORATION AND INTRODUCTION TO THE TOURIST CIRCUIT OF THE METROPOLITAN CATHEDRAL IN CLUJ NAPOCA | ARCHBISHOP OF VAD FELEACULI AND CLJUI | The municipality of Cluj-Napoca | 34,461,307.41 | 28,706,269.02 | 5,065,812.19 | 689,226.20 | 22,433,720.04 | 56,895,027.45 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302104 | 12 | Rehabilitation and enhancement of the Bathory Fortress Ensemble | UAT Simleu City of Silvania | City of Simleu Silvaniei | 34,746,496.03 | 29,534,521.63 | 4,517,044.48 | 694,929.92 | 3,058,149.36 | 37,804,645.39 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302040 | 33 | REHABILITATION AND RESTRUCTURING BUILDING C1 AND BUILDING C3, CHANGE OF DESTINATION OF BUILDING C1 FROM PARISH HOUSE TO CULTURAL FUNCTIONS AND INTRODUCING THE HOLY TRINITY COMPLEX IN CLUJ-NAPOCA INTO THE TOURIST CIRCUIT, EXTERIOR ARRANGEMENTS AND SITE ORGANIZATION | Holy Trinity Romanian Orthodox Parish | The municipality of Cluj-Napoca | 10,857,386.54 | 9,044,202.95 | 1,596,035.82 | 217,147.77 | 10,504,921.08 | 21,362,307.62 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302105 | 25 | Dezvoltarea Integrată și Durabilă a Patrimoniului și Turismului Cultural în Municipiul Carei – Complex Castel Karolyi și Parc Dendrologic – Etapa a II-a | UAT Carei Municipality | The municipality of Carei | 34,746,599.99 | 29,534,609.99 | 4,517,058.00 | 694,932.00 | 5,382,706.92 | 40,129,306.91 | Signed contract | ||||||
PRNV/2023/721/1 | Q7 | OS5.2 | 302216 | 51 | Rehabilitation and capitalization in the tourist circuit of the Geza Teleki Castle in the town of Pribilesti | UAT Maramureș County | satulung | 33,578,647.64 | 28,541,850.49 | 4,365,224.20 | 671,572.95 | 27,597,632.29 | 61,176,279.93 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 302109 | 18 | Rehabilitation of Juhasz Gyula High School | UAT Oradea Municipality | Oradea municipality | 18/01/2024 | 05/04/2024 | 10,678,279.72 | 9,076,537.76 | 1,388,176.35 | 213,565.61 | 762,366.13 | 11,440,645.85 | Signed contract | ||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303539 | 45 | SLOW MOBILITY CORRIDOR - CRASNA RIVER BEACH IN THE CITY OF SIMLEU SILVANIEI | UAT Simleu City of Silvania | City of Simleu Silvaniei | 23,203,284.82 | 19,722,792.10 | 3,016,427.02 | 464,065.70 | 0.00 | 23,203,284.82 | Signed contract | ||||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303536 | 54 | Urban regeneration in the City of Sângeorz-Băi | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 14,081,054.24 | 11,968,896.10 | 1,830,537.05 | 281,621.09 | 506,075.56 | 14,587,129.80 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300583 | 32 | Energy rehabilitation for the A building of the Clinical Recovery Hospital Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 16,253,989.49 | 13,815,891.07 | 2,113,018.62 | 325,079.80 | 779,049.74 | 17,033,039.23 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300584 | 31 | Thermal rehabilitation and energy efficiency of the Clinical Hospital for Infectious Diseases Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 18/01/2024 | 20/05/2024 | 34,576,087.68 | 29,389,674.53 | 4,494,891.37 | 691,521.78 | 4,630,256.24 | 39,206,343.92 | Signed contract | ||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301724 | 24 | Development of uneven intersection between DJ 767M and DC 44 in order to increase traffic safety | UAT Bihor County | OSORHEI | 55,474,413.26 | 47,153,251.27 | 7,211,673.73 | 1,109,488.26 | 6,729,742.25 | 62,204,153.51 | Signed contract | ||||||
PRNV/2023/522.B/1 | P5 | OS3.2 | 303552 | 9 | Equipment for increasing traffic safety in Cluj county | UAT Cluj County | AGHIRESU | 18/03/2024 | 5,121,216.66 | 4,353,034.16 | 665,758.16 | 102,424.34 | 0.00 | 5,121,216.66 | Signed contract | |||||
PRNV/2023/623/1 | P6 | OS4.2 | 304325 | 10 | Modernization and rehabilitation of the educational structure Anatomie Building, str. Clinicilor no. 3-5, Cluj-Napoca | UNIVERSITY OF MEDICINE AND PHARMACY, IULIU HATIEGANU"" CLUJ NAPOCA | The municipality of Cluj-Napoca | 32,543,279.99 | 16,271,640.00 | 15,620,774.39 | 650,865.60 | 23,446,644.17 | 55,989,924.16 | Signed contract | ||||||
PRNV/2023/623/1 | P6 | OS4.2 | 304328 | 15 | The development of the educational infrastructure of the Technical University of Cluj-Napoca by rehabilitating and equipping CORP C1 Str. Observatory, no. 2, Cluj-Napoca municipality" | TECHNICAL UNIVERSITY OF CLUJ NAPOCA | The municipality of Cluj-Napoca | 05/12/2023 | 02/04/2024 | 32,517,074.29 | 16,258,537.15 | 15,608,195.65 | 650,341.49 | 503,085.16 | 33,020,159.45 | Signed contract | ||||
PRNV/2023/623/1 | P6 | OS4.2 | 304295 | 11 | Modernization of the educational infrastructure for the students of the Faculty of Medicine and Pharmacy - building C2, campus III | ORADEA UNIVERSITY | Oradea municipality | 10,126,102.68 | 5,063,051.37 | 4,860,529.25 | 202,522.06 | 0.00 | 10,126,102.68 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305885 | 34 | Building building (1-2S)+P+E+R/M with medical clinic destination | OSTEOPROTECT SRL | Oradea municipality | 15,883,278.23 | 6,286,765.74 | 1,109,429.25 | 8,487,083.24 | 682,971.53 | 16,566,249.76 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305883 | 38 | Construction and equipment of a recovery center with S+P+E+M height regime in Ardud Vii locality, Satu Mare county | VITAL CLINIQUE SRL | Oraş Ardud | 10,108,639.92 | 6,212,817.96 | 1,096,379.64 | 2,799,442.32 | 7,903,024.30 | 18,011,664.22 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305886 | 35 | Increasing the competitiveness of the Medimage clinic by diversifying medical services | MEDIMAGES SRL | The municipality of Cluj-Napoca | 11,144,167.60 | 5,863,167.88 | 1,034,676.68 | 4,246,323.04 | 0.00 | 11,144,167.60 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309660 | 13 | Intelligent production: automations and innovations | FLACARA IMPEX SRL | Bistrita municipality | 4,549,805.21 | 2,763,489.09 | 487,674.55 | 2,178,261.66 | 879,260.09 | 5,429,425.30 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309132 | 30 | INCREASING THE COMPETITIVENESS OF FEMARIS SRL THROUGH THE CONSTRUCTION OF A PRODUCTION HALL AND EQUIPPED WITH PERFORMING EQUIPMENT | FEMARIS SRL | OSORHEI | 6,415,176.25 | 3,445,583.15 | 608,044.09 | 2,361,549.01 | 1,206,243.09 | 7,621,419.34 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310555 | 43 | Advanced technologies in equipment production | INOTEC SRL | The municipality of Cluj-Napoca | 2,284,107.57 | 1,032,370.71 | 182,183.07 | 1,069,553.79 | 652,874.83 | 2,936,982.40 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310437 | 55 | INCREASING COMPETITIVENESS AT RND AUTOMATIC SOL SRL | RND AUTOMATIC SOL SRL | Municipiul Satu Mare | 10,330,725.00 | 6,223,497.61 | 1,098,264.29 | 3,008,963.10 | 6,809,785.47 | 17,140,510.47 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 312002 | 36 | Innovation in the production of pre-wired tubes - Efficiency and Performance | BEA & MAGDA SRL | The municipality of Cluj-Napoca | 5,737,749.22 | 3,028,540.42 | 534,448.31 | 2,174,760.49 | 1,442,231.46 | 7,179,980.68 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 306247 | 41 | Rehabilitation and modernization of roads in Țara Sylvania | UAT Sălaj County | Nușfalău | 296,368,642.81 | 251,913,346.38 | 38,547,823.50 | 5,907,472.93 | 120,947,405.80 | 417,316,048.61 | Signed contract | ||||||
PRNV/2023/622.A/1 | P6 | OS4.2 | 313339 | 14 | CONSTRUCTION AND EQUIPMENT OF 6 MODERN SCHOOL WORKSHOPS AT TECHNOLOGICAL HIGH SCHOOL NO. 1, CADEA | UAT Săcueni City | City of Săcueni | 11,186,100.94 | 5,593,050.47 | 5,369,328.46 | 223,722.01 | 0.00 | 11,186,100.94 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 316629 | 37 | ROBOTICS IN THE PRODUCTION OF ELECTRICAL CABLES | RCB ELECTRO 97 SA | Bistrita municipality | 5,054,273.98 | 2,688,179.72 | 474,384.66 | 1,891,709.60 | 1,127,423.60 | 6,181,697.58 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 316955 | 83 | "IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN BETFIA, SANMARTIN MUNICIPALITY, BIHOR COUNTY IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN CORDAU, SANMARTIN MUNICIPALITY, BIHOR COUNTY INFRASTRUCTURE IMPROVEMENT DAY THROUGH THE EXTENSION AND MODERNIZATION OF THE PARK IN THE LOCATION " | UAT SâNMARTIN MUNICIPALITY | Sânmartin | 23,561,515.06 | 20,027,287.80 | 3,062,996.96 | 471,230.30 | 345,321.91 | 23,906,836.97 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300445 | 62 | DEVELOPMENT OF GREEN SPACE IN THE LAC HOSTEZE AREA, TOWN OF TAUțII MĐHERĂUȘ, Maramureș County | UAT The City of Tăuții Magherăuș | Town of Tăuţii- Magherăus | 8,428,844.69 | 7,164,517.99 | 1,095,749.79 | 168,576.91 | 88,455.01 | 8,517,299.70 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 318456 | 81 | CONSTRUCTION OF A GREEN SPACE IN THE MUNICIPALITY OF NOJORID, Jud. Bihor | UAT Nojorid Commune | Nojorid | 15,666,333.32 | 13,316,383.32 | 2,036,623.33 | 313,326.67 | 0.00 | 15,666,333.32 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324092 | 70 | Revitalizarea spațiului pietonal din centrul istoric al Municipiului Turda, construire autobază și amenajare park and ride | UAT Turda Municipality | Turda municipality | 15,212,201.35 | 12,930,371.15 | 1,977,586.18 | 304,244.02 | 259,947.96 | 15,472,149.31 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324347 | 66 | Revitalizarea fizică, economică și socială a Orașului Săcueni | UAT Săcueni City | City of Săcueni | 2,009,103.41 | 1,707,737.90 | 261,183.48 | 40,182.03 | 2,116,151.16 | 4,125,254.57 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324158 | 84 | Modernizarea coridorului de mobilitate urbană integrată în zona de est a municipiului Turda | UAT Turda Municipality | Turda municipality | 20,353,178.43 | 17,300,201.66 | 2,645,913.20 | 407,063.57 | 24,205.04 | 20,377,383.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324376 | 67 | Creșterea performantei energetice a Spitalului Clinic Municipal Dr. Gavril Curteanu Oradea | UAT Oradea Municipality | Oradea municipality | 9,256,629.11 | 7,868,134.74 | 1,203,361.79 | 185,132.58 | 3,708,144.85 | 12,964,773.96 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324461 | 92 | Îmbunătățrea serviciilor educaționale și a spațiilor publice în Orașul Valea lui Mihai | UAT Valea lui Mihai city | Valea Lui Mihai city | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324161 | 46 | The regeneration of the Mihai Viteazu Obelisk area through the creation of a new public park in Turda Municipality | UAT Turda Municipality | Turda municipality | 2,359,116.09 | 2,005,248.08 | 306,685.07 | 47,182.34 | 9,817.50 | 2,369,933.59 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324407 | 64 | Modernization of the integrated urban mobility corridor in the western area of Turda Municipality | UAT Turda Municipality | Turda municipality | 14,138,350.57 | 12,017,597.98 | 1,837,985.57 | 282,767.02 | 13,105.84 | 14,151,456.41 | Signed contract | ||||||
PRNV/2024/713.Etap | Q7 | OS5.1 | 324492 | 56 | SOS (Village-Town-Resort) AQUA PRIMUS SINGEORZ-BAI | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 773,964.96 | 657,870.22 | 100,615.44 | 15,479.30 | 1,039,657.68 | 1,813,622.64 | Signed contract | ||||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324429 | 71 | Development of the Lac Stei recreation area | UAT City of Stei | City of Stei | 24/05/2024 | 212,284.42 | 180,441.76 | 27,596.97 | 4,245.69 | 229,884.61 | 442,169.03 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324411 | 79 | Amenajare piste de biciclete, pod rutier peste râul Someșul Mare și asfaltare străzi în orașul Sîngeorz Băi | UAT City of Sangeorz Bai | Oraş Sângeorz- Bă | 3,927,075.71 | 3,338,014.35 | 510,519.82 | 78,541.54 | 704,760.54 | 4,631,836.25 | Signed contract | ||||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324110 | Cercetarea, proiectarea și dezvoltarea vehiculelor electrice ecologice realizate din materiale compozite avansate, echipate cu panouri fotovoltaice și realizarea unei linii de asamblare în vederea obținerii produsului final | BELCO AVIA SRL | orchards | 24/05/2024 | 21,829,162.86 | 11,135,083.06 | 1,965,014.66 | 8,729,065.14 | 8,414,091.28 | 30,243,254.14 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324472 | 57 | Creation of the Carei Recreation Center | UAT Carei Municipality | The municipality of Carei | 21/05/2024 | 21/06/2024 | 5,019,836.73 | 4,266,861.22 | 652,578.76 | 100,396.75 | 13,934.90 | 5,033,771.63 | Signed contract | ||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324112 | 80 | Modernization of the integrated urban mobility corridor in the central area of Turda Municipality | UAT Turda Municipality | Turda municipality | 31/05/2024 | 10/07/2024 | 7,586,329.85 | 6,448,380.37 | 986,222.88 | 151,726.60 | 6,805.04 | 7,593,134.89 | Signed contract | ||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324387 | ÎNFIINȚARE PARC ȘTIINȚIFIC ȘI TEHNOLOGIC BIHOR - Etapa 2 | UAT Bihor County | Oradea municipality | 28/05/2024 | 23/07/2024 | 6,787,049.12 | 2,929,091.82 | 516,898.56 | 3,341,058.74 | 0.00 | 6,787,049.12 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324493 | 58 | Titlu Proiect: Creare Centru Multifunctional Carei | UAT Carei Municipality | The municipality of Carei | 23/05/2024 | 21/06/2024 | 8,556,798.11 | 7,273,278.39 | 1,112,383.74 | 171,135.98 | 3,411,797.85 | 11,968,595.96 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324170 | 69 | Construire Centru Social de Zi, Patinoar și Skate Park în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 15,720,248.36 | 13,363,211.11 | 2,043,632.28 | 314,404.97 | 0.00 | 15,720,248.36 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324180 | 68 | Construire grădinița în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzi | 6,337,950.65 | 3,168,975.32 | 3,042,216.32 | 126,759.01 | 1,095,550.51 | 7,433,501.16 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324556 | 42 | Creșterea gradului de participare la nivelul învățământului obligatoriu în cadrul Școlii gimnaziale nr.1 Carei | UAT Carei Municipality | The municipality of Carei | 20/05/2024 | 03/06/2024 | 3,365,186.95 | 1,682,593.47 | 1,615,289.74 | 67,303.74 | 427,597.55 | 3,792,784.50 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324124 | 52 | Revitalizare spații publice urbane, îmbunătățirea serviciilor sociale și cultural-recreative în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 6,090,487.83 | 5,176,914.66 | 791,763.43 | 121,809.74 | 5,047,411.38 | 11,137,899.21 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324125 | 48 | Revitalizare spații publice urbane, îmbunătățirea serviciilor educaționale și sociale în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 7,137,878.90 | 6,067,197.07 | 927,924.26 | 142,757.58 | 61,761.00 | 7,199,639.90 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324400 | 47 | Construire locuințe sociale în Municipiul Carei | UAT Carei Municipality | The municipality of Carei | 3,823,961.94 | 3,250,367.65 | 497,115.05 | 76,479.24 | 7,850.00 | 3,831,811.94 | Signed contract | ||||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324666 | Dezvoltarea Centrului de Tranfer Tehnologic al Universității din Oradea - Smart Industries - etapa II | ORADEA UNIVERSITY | Oradea municipality | 13,850,000.00 | 5,886,250.00 | 1,038,750.00 | 6,925,000.00 | 2,642,395.18 | 16,492,395.18 | Signed contract | |||||||
PRNV/2024/711.Etap | Q7 | OS5.1 | 324718 | 76 | Reabilitarea, modernizarea și dotarea Teatrului Aureliu Manea, Turda | UAT Turda Municipality | Turda municipality | 28/05/2024 | 21,631,351.46 | 18,386,648.74 | 2,812,075.69 | 432,627.03 | 0.00 | 21,631,351.46 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324127 | 86 | Improving the quality of life of the population by creating a multifunctional center and rehabilitating the central area of Baia Sprie | UAT City of Baia Sprie | City of Baia Sprie | 28/05/2024 | 8,390,900.26 | 7,132,265.22 | 1,090,817.01 | 167,818.03 | 9,996,105.20 | 18,387,005.46 | Signed contract | |||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324779 | Obținerea de produse farmaceutice și dermatocosmetice inovative având la bază substanțe active de sinteză în asociere cu extracte vegetale din plante, alge şi cianobacterii | SAPIENT SRL | Oradea municipality | 28/05/2024 | 56,407,636.97 | 34,543,357.53 | 6,095,886.62 | 15,768,392.82 | 21,401,607.72 | 77,809,244.69 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324531 | 87 | Amenajare Zona Cultural-Recreativă “Trei Lacuri” din Municipiul Câmpia Turzii | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 2,885,674.70 | 2,452,823.39 | 375,137.69 | 57,713.49 | 9,109,007.07 | 11,994,681.64 | Signed contract | ||||||
PRNV/2024/311.Etap | P3 | OS2.1 | 324340 | 82 | Creșterea eficienței energetice a blocurilor de locuințe în municipiul Baia Mare - CF 7 | UAT Baia Mare Municipality | Baia Mare municipality | 7,690,915.62 | 6,537,278.27 | 999,819.03 | 153,818.32 | 1,637,444.15 | 9,329,359.77 | Signed contract | ||||||
PRNV/2024/622.Etap | P6 | OS4.2 | 324236 | 93 | Dezvoltarea infrastructurii de educatie tehnologica prin modernizarea Colegiului Tehnic "Transilvania" din Municipiul Baia Mare - etapa II | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324931 | 60 | Restaurarea, conservarea și reabilitarea clădirii fostei Judecătorii (P-ța Republicii nr. 5) și redestinarea ei ca Centru de cultură, artă și tradiții | UAT Turda Municipality | Turda municipality | 13,150,110.47 | 11,177,593.90 | 1,709,514.36 | 263,002.21 | 0.00 | 13,150,110.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324140 | 89 | Cresterea eficientei energetice in cladirile publice din Municipiul Baia Mare-Spitalul de Pneumoftiziologie "Dr. Nicolae Rusdea" | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324515 | 74 | CENTRU MULTIFUNCȚIONAL RECREATIV MARGHITA | UAT Marghita Municipality | Marghita municipality | 12,428,309.61 | 10,564,063.17 | 1,615,680.26 | 248,566.19 | 8,526,001.96 | 20,954,311.57 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324159 | 77 | EXTINDERE, MANSARDARE, MODERNIZARE ȘI DOTARE ȘCOALA GIMNAZIALĂ NR. 1, GHERLA | UAT Gherla Municipality | The municipality of Gherla | 17,036,498.08 | 8,518,249.04 | 8,177,519.08 | 340,729.96 | 15,911,734.82 | 32,948,232.90 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324520 | 75 | Centru Educațional Multifuncțional ”Octavian Goga” | UAT Marghita Municipality | Marghita municipality | 6,453,909.86 | 3,226,954.93 | 3,097,876.74 | 129,078.19 | 9,245,321.60 | 15,699,231.46 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324396 | 63 | Reabilitare bloc de locuinte sociale strada Luminisului 13 A | UAT Baia Mare Municipality | Baia Mare municipality | 1,713,009.27 | 1,456,057.88 | 222,691.20 | 34,260.19 | 8,104,560.44 | 9,817,569.71 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324397 | 61 | Rehabilitation of social housing block, Horea street 46A | UAT Baia Mare Municipality | Baia Mare municipality | 3,125,543.30 | 2,656,711.81 | 406,320.63 | 62,510.87 | 8,821,170.06 | 11,946,713.36 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324557 | 88 | Reabilitarea, modernizarea și dotarea spațiilor Bibliotecii Municipale “Ioan Munteanu” pentru a crea un centru cultural-recreativ, modernizarea parcului central si realizarea culoarului pietonal de legătură în zona centrală pentru a integra zona cultural-socială centrală a municipiului | UAT Marghita Municipality | Marghita municipality | 28/05/2024 | 3,609,323.42 | 3,067,924.91 | 469,212.05 | 72,186.46 | 0.00 | 3,609,323.42 | Signed contract | |||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324361 | 90 | Transformarea zonei degradate malurile Somesului intre cele 2 poduri in zona de petrecere a timpului liber pentru comunitate | UAT Municipiul Satu Mare | Municipiul Satu Mare | 28/05/2024 | 7,973,696.80 | 6,777,642.28 | 1,036,580.58 | 159,473.94 | 1,157,455.66 | 9,131,152.46 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324086 | 85 | Modernizarea coridorului integrat de mobilitate urbană reprezentat de str. 1 Mai (tronson 1 Mai 182 - intersecție Str. Ion Pop Reteganu), Str. Ion Pop Rateganu - Pod Someș - Str. Libertății - Str. Bistriței până la limita administrativ teritorială a municipiului Dej, inclusiv acces către Autobaza TRANSURB Dej și modernizare Autobaza TRANSURB SA | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 11,428,422.50 | 9,714,159.13 | 1,485,694.93 | 228,568.45 | 2,522,574.35 | 13,950,996.85 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324100 | 53 | Increasing the quality of life of the population of Dej municipality by building and equipping the cultural-recreational center and improving urban public spaces in the Dealul Florilor neighborhood | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 8,893,820.17 | 7,559,747.14 | 1,156,196.63 | 177,876.40 | 0.00 | 8,893,820.17 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324118 | 72 | DEZVOLTAREA INFRASTRUCTURII DE TRANSPORT ALTERNATIV ÎN MUNICIPIUL DEJ - punte pietonală și modernizare coridor infrastructură integrată în Ocna Dej | UAT Municipality Dej | The municipality of Dej | 2,418,342.50 | 2,418,342.50 | 314,384.53 | 48,366.85 | 2,235,987.97 | 4,654,330.47 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324119 | 73 | Amenajarea zonei pietonale centrale în vederea reducerii emisiilor de carbon din zona centrală a municipiului Dej | UAT Municipality Dej | The municipality of Dej | 14,844,007.97 | 12,617,406.77 | 1,929,721.05 | 296,880.15 | 334,440.23 | 15,178,448.20 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324087 | 65 | Improvement of public and non-motorized transport in the municipality of Dej | UAT Municipality Dej | The municipality of Dej | 4,633,354.42 | 3,938,351.26 | 602,336.07 | 92,667.09 | 331,277.44 | 4,964,631.87 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324731 | 78 | Reabilitare, cresterea eficientei energetice, gestionarea eficienta a energiei la imobile existente, corpurile C2 si C20, modificari interioare, amenajari spatii de lucru in pod existent (C2) amenajare incinta si refacere imprejumuire la IPJ si DJI Cluj | POLICE INSPECTOR OF THE COUNTY. CLUJ | The municipality of Cluj-Napoca | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324120 | 50 | Creșterea calitatii vieții in municipiul Dej prin construirea si dotarea centrului social,recreativ si îmbunătăţirea spațiilor publice urbane din zona acestuia | UAT Municipality Dej | The municipality of Dej | 22,991,883.50 | 19,543,100.98 | 2,988,944.85 | 459,837.67 | 12,132,396.28 | 35,124,279.78 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324121 | 49 | Construirea unei clădiri cu destinaţia şcoală clasele V-VIII pentru Şcoala gimnazială nr.1 Dej | UAT Municipality Dej | The municipality of Dej | 2,831,340.65 | 1,415,670.33 | 1,359,043.52 | 56,626.80 | 1,332,427.94 | 4,163,768.59 | Signed contract |
Status of signed contracts Priority 8
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. crt. | Call Code | Priority | BONE | SMIS code | Contract number | Project title | Beneficiary | Partner | Location | Project summary | Project start date | Project completion date | Eligible value | ERDF contribution | Contribution BS | Contribution Beneficiary | Ineligible value | Total project value | Stage | Remarks |
PRNV/2023/AT/1 | P8 | AT | 322335 | 1 | Support for ADR North-West, as the Management Authority, for the implementation of the North-West Regional Program in the North-West Development Region, in the period 2021-2023 | ADR North-West | The municipality of Cluj-Napoca | 37,066,098.44 | 31,506,183.68 | 5,559,914.76 | 0.00 | 0.00 | 37,066,098.44 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 300242 | 2 | Construction and rehabilitation of secondary road links to the road network and TEN-T nodes in Bihor County | UAT Bihor County | Salonta municipality | 23/12/2021 | 31/12/2027 | 297,827,999.75 | 253,153,799.79 | 38,717,639.96 | 5,956,560.00 | 334,843,791.40 | 632,671,791.15 | Signed contract | ||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300350 | 7 | Establishment and development of Tașnad Urban Garden | UAT Tașnad City | Satu Mare | The project proposes the establishment of an urban garden-type green space on a degraded and unused land, according to letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the urban areas. The location of the investment, free of above-ground constructions, is registered in the Register of green spaces as degraded land, according to extracts CF 101921, 101922. The Urban Garden is organized in three main areas: an area equipped with playgrounds for children, teenagers and young people, a area containing a basketball court bordered by a small natural amphitheater and 16 themed "grassland lounges". Three of these "lounges" are located in the active area of the Garden, where athletes and spectators can meet and spend time together. The others are hidden in the pre-existing deciduous forest, so the experience amounts to complete immersion in nature. | 24,515,127.70 | 20,837,858.54 | 3,186,966.59 | 490,302.57 | 778,052.79 | 25,293,180.49 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300351 | 6 | IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: DEVELOPING A PARK ON BERZEI STR. SANTANDREI MUNICIPALITY, BIHOR COUNTY, respectively DEVELOPING A PARK ON STRADA KLOPOTEILOR, SANTANDREI MUNICIPALITY, BIHOR COUNTY | UAT Commune of Santander | Santandrei | This project proposes the establishment of green spaces of the square type, in accordance with letter a, related to Law no. 24/2007 regarding the regulation and administration of green spaces in the rural areas of localities, because this area is degraded, unused land. The arrangement will be approached in an integrated manner and will be carried out on the basis of a complex specialized project aimed at improving the rural image, protecting biodiversity, developing connections and pedestrian movements, creating attractive recreation areas, organizing urban furniture and vegetation in accordance with the specifics of the area. The main purpose of the proposed works is to increase the quality of life of the residents of the adjacent neighborhood, it is desired that the park be an attractive space for all age groups, a space for both active and passive rest intended at the same time for sports, relaxation and walks. | 24,305,093.15 | 20,659,329.18 | 3,159,662.11 | 486,101.86 | 799,061.20 | 25,104,154.35 | Signed contract | |||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300352 | 4 | Establishment and Development of the "Urban Garden Transilvania" Botanical Park | UAT Beclean City | Beclean city | The project aims to establish and arrange a new green space that will have an area of 41321 square meters. The basic investment will be made in the city of Beclean - Land Deed no. 30510 (land surface 41321 sqm), land located in the inner city. The proposed botanical park covers approximately 4 hectares and is part of the extended project of the Transilvania Urban Garden in the city of Beclean. The proposed park is divided into 4 main areas: 1. Relaxation area (mounded area - located in the southeast allowing people to interact with each other thanks to welcoming open spaces. 2. Buffer zone (dense vegetation) 3. Protected plantation (Romanian species on the verge of extinction - with grass plantation, it is proposed to restore and protect the fauna of the place.) 4. Noisy area (Sports activities). | 24,147,606.65 | 20,525,465.64 | 3,139,188.85 | 482,952.16 | 764,542.33 | 24,912,148.98 | Signed contract | |||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300542 | 5 | Increasing energy efficiency and rehabilitating the building located in Oradea, strada Republicii no. 35 | UAT Bihor County | Bihor | 04/12/2023 | 05/02/2024 | 23,147,275.27 | 19,675,183.97 | 3,009,145.79 | 462,945.51 | 24,912,535.70 | 48,059,810.97 | Signed contract | ||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300543 | 8 | Cresterea eficientei energetice si gestionarea Inteligenta a energiei in cladirile publice cu destinatie de unitati de invatamant – Liceul Teoretic German F. Schiller | UAT Oradea Municipality | Oradea municipality | 04/12/2023 | 22/02/2024 | 9,408,599.19 | 7,997,309.31 | 1,223,117.89 | 188,171.99 | 6,426,799.41 | 15,835,398.60 | Signed contract | ||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301378 | 23 | Increasing urban mobility in the city of Taşnad by creating the mobility corridor in the North-West direction | UAT Tașnad City | Taşnad city | 31,162,080.82 | 26,487,768.70 | 4,051,070.42 | 623,241.70 | 1,869,849.02 | 33,031,929.84 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301400 | 40 | CREATION OF BAIA SPRIE-CHIUZBAIA MOBILITY CORRIDOR | UAT City of Baia Sprie | City of Baia Sprie | 88,355,310.03 | 75,102,013.53 | 11,486,190.31 | 1,767,106.19 | 7,780,247.25 | 96,135,557.28 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301405 | 16 | GHERLA 2 MOBILITY CORRIDOR | UAT Gherla Municipality | The municipality of Gherla | 88,603,652.82 | 75,313,104.90 | 11,518,474.86 | 1,772,073.06 | 6,639,343.88 | 95,242,996.70 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301398 | 28 | URBAN MOBILITY CORRIDOR BY CREATING CYCLE PATHS AND PRIORITY CORRIDOR FOR ECOLOGICAL PUBLIC TRANSPORT. ROUTE I FROM EAST TO WEST AND ROUTE II FROM SOUTH TO WEST IN THE MUNICIPALITY OF SALONTA | UAT Salonta Municipality | Salonta municipality | 70,158,693.21 | 59,634,889.23 | 9,120,630.12 | 1,403,173.86 | 3,583,202.80 | 73,741,896.01 | Signed contract | ||||||
PRNV/2023/481.B/1 | P4 | OS2.8 | 301393 | 22 | GHERLA MOBILITY CORRIDOR 1 | UAT Gherla Municipality | The municipality of Gherla | 15/09/2023 | 80,722,235.10 | 68,613,899.83 | 10,493,890.56 | 1,614,444.71 | 5,957,524.32 | 86,679,759.42 | Signed contract | |||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301478 | 59 | Implementation of solutions to increase traffic safety on the county road network in Bihor County | UAT Bihor County | Bihor | 74,456,961.28 | 63,288,417.09 | 967,940,497.00 | 1,489,139.22 | 17,476,140.19 | 91,933,101.47 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301606 | 19 | ESTABLISHMENT OF ALESD INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Elected city | 21,560,796.36 | 7,330,670.76 | 1,293,647.78 | 12,936,477.82 | 958,021.90 | 22,518,818.26 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301609 | 27 | ESTABLISHMENT OF BEIUȘ INTELLIGENT SPECIALIZATION PARK | UAT Bihor County | Beiuş municipality | 23,698,193.84 | 8,057,385.90 | 1,421,891.63 | 14,218,916.31 | 20,431,236.79 | 44,129,430.63 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301612 | 29 | MARGHITA INTELLIGENT SPECIALIZATION PARK ESTABLISHMENT | UAT Bihor County | Marghita municipality | 24,223,222.05 | 8,578,475.68 | 1,513,848.65 | 14,130,897.72 | 6,492,484.27 | 30,715,706.32 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301602 | 20 | Baia Sprie Intelligence Specialization Park Development | UAT Maramureș County | City of Baia Sprie | 39,005,020.74 | 16,674,883.81 | 2,942,626.56 | 19,387,510.37 | 14,262,285.34 | 53,267,306.08 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301558 | 39 | Creation and development of the intelligent specialization park Somcuta Mare, Maramures county | UAT Maramureș County | Somcuţa Mare city | 30,303,946.90 | 13,101,456.68 | 2,312,021.77 | 14,890,468.45 | 2,840,964.92 | 33,144,911.82 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301604 | 44 | Targu Lapus Intelligence Specialization Park Development | UAT Maramureș County | Town of Târgu Lăpuş | 21,396,260.69 | 9,191,160.79 | 1,621,969.55 | 10,583,130.35 | 8,077,330.74 | 29,473,591.43 | Signed contract | ||||||
PRNV/2023/132.A.1/1 | P1 | OS1.3 | 301621 | 26 | ESTABLISHMENT OF INTELLIGENT SPECIALIZATION PARK STEI | UAT Bihor County | City of Stei | 27,140,000.34 | 9,373,519.73 | 1,654,150.54 | 16,112,330.07 | 578,460.18 | 27,718,460.52 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302122 | 21 | Rehabilitation of the municipal museum in Beius | UAT Beiuș Municipality | Beiuş municipality | 18,300,168.11 | 15,555,142.89 | 2,379,014.02 | 366,011.20 | 0.00 | 18,300,168.11 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302106 | 17 | Restoration of the Synagogue building | UAT City of Seini | Seini city | 10,856,606.58 | 9,228,115.59 | 1,411,358.82 | 217,132.17 | 1,359,161.60 | 12,215,768.18 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302121 | 3 | REHABILITATION, RESTORATION AND INTRODUCTION TO THE TOURIST CIRCUIT OF THE METROPOLITAN CATHEDRAL IN CLUJ NAPOCA | ARCHBISHOP OF VAD FELEACULI AND CLJUI | The municipality of Cluj-Napoca | 34,461,307.41 | 28,706,269.02 | 5,065,812.19 | 689,226.20 | 22,433,720.04 | 56,895,027.45 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302104 | 12 | Rehabilitation and enhancement of the Bathory Fortress Ensemble | UAT Simleu City of Silvania | City of Simleu Silvaniei | 34,746,496.03 | 29,534,521.63 | 4,517,044.48 | 694,929.92 | 3,058,149.36 | 37,804,645.39 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302040 | 33 | REHABILITATION AND RESTRUCTURING BUILDING C1 AND BUILDING C3, CHANGE OF DESTINATION OF BUILDING C1 FROM PARISH HOUSE TO CULTURAL FUNCTIONS AND INTRODUCING THE HOLY TRINITY COMPLEX IN CLUJ-NAPOCA INTO THE TOURIST CIRCUIT, EXTERIOR ARRANGEMENTS AND SITE ORGANIZATION | Holy Trinity Romanian Orthodox Parish | The municipality of Cluj-Napoca | 10,857,386.54 | 9,044,202.95 | 1,596,035.82 | 217,147.77 | 10,504,921.08 | 21,362,307.62 | Signed contract | ||||||
PRNV/2023/711/1 | Q7 | OS5.1 | 302105 | 25 | Dezvoltarea Integrată și Durabilă a Patrimoniului și Turismului Cultural în Municipiul Carei – Complex Castel Karolyi și Parc Dendrologic – Etapa a II-a | UAT Carei Municipality | The municipality of Carei | 34,746,599.99 | 29,534,609.99 | 4,517,058.00 | 694,932.00 | 5,382,706.92 | 40,129,306.91 | Signed contract | ||||||
PRNV/2023/721/1 | Q7 | OS5.2 | 302216 | 51 | Rehabilitation and capitalization in the tourist circuit of the Geza Teleki Castle in the town of Pribilesti | UAT Maramureș County | satulung | 33,578,647.64 | 28,541,850.49 | 4,365,224.20 | 671,572.95 | 27,597,632.29 | 61,176,279.93 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 302109 | 18 | Rehabilitation of Juhasz Gyula High School | UAT Oradea Municipality | Oradea municipality | 18/01/2024 | 05/04/2024 | 10,678,279.72 | 9,076,537.76 | 1,388,176.35 | 213,565.61 | 762,366.13 | 11,440,645.85 | Signed contract | ||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303539 | 45 | SLOW MOBILITY CORRIDOR - CRASNA RIVER BEACH IN THE CITY OF SIMLEU SILVANIEI | UAT Simleu City of Silvania | City of Simleu Silvaniei | 23,203,284.82 | 19,722,792.10 | 3,016,427.02 | 464,065.70 | 0.00 | 23,203,284.82 | Signed contract | ||||||
PRNV/2023/714.B/1 | Q7 | OS5.1 | 303536 | 54 | Urban regeneration in the City of Sângeorz-Băi | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 14,081,054.24 | 11,968,896.10 | 1,830,537.05 | 281,621.09 | 506,075.56 | 14,587,129.80 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300583 | 32 | Energy rehabilitation for the A building of the Clinical Recovery Hospital Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 16,253,989.49 | 13,815,891.07 | 2,113,018.62 | 325,079.80 | 779,049.74 | 17,033,039.23 | Signed contract | ||||||
PRNV/2023/312.A/1 | P3 | OS2.1 | 300584 | 31 | Thermal rehabilitation and energy efficiency of the Clinical Hospital for Infectious Diseases Cluj-Napoca | UAT Cluj County | The municipality of Cluj-Napoca | 18/01/2024 | 20/05/2024 | 34,576,087.68 | 29,389,674.53 | 4,494,891.37 | 691,521.78 | 4,630,256.24 | 39,206,343.92 | Signed contract | ||||
PRNV/2023/522.A/1 | P5 | OS3.2 | 301724 | 24 | Development of uneven intersection between DJ 767M and DC 44 in order to increase traffic safety | UAT Bihor County | OSORHEI | 55,474,413.26 | 47,153,251.27 | 7,211,673.73 | 1,109,488.26 | 6,729,742.25 | 62,204,153.51 | Signed contract | ||||||
PRNV/2023/522.B/1 | P5 | OS3.2 | 303552 | 9 | Equipment for increasing traffic safety in Cluj county | UAT Cluj County | AGHIRESU | 18/03/2024 | 5,121,216.66 | 4,353,034.16 | 665,758.16 | 102,424.34 | 0.00 | 5,121,216.66 | Signed contract | |||||
PRNV/2023/623/1 | P6 | OS4.2 | 304325 | 10 | Modernization and rehabilitation of the educational structure Anatomie Building, str. Clinicilor no. 3-5, Cluj-Napoca | UNIVERSITY OF MEDICINE AND PHARMACY, IULIU HATIEGANU"" CLUJ NAPOCA | The municipality of Cluj-Napoca | 32,543,279.99 | 16,271,640.00 | 15,620,774.39 | 650,865.60 | 23,446,644.17 | 55,989,924.16 | Signed contract | ||||||
PRNV/2023/623/1 | P6 | OS4.2 | 304328 | 15 | The development of the educational infrastructure of the Technical University of Cluj-Napoca by rehabilitating and equipping CORP C1 Str. Observatory, no. 2, Cluj-Napoca municipality" | TECHNICAL UNIVERSITY OF CLUJ NAPOCA | The municipality of Cluj-Napoca | 05/12/2023 | 02/04/2024 | 32,517,074.29 | 16,258,537.15 | 15,608,195.65 | 650,341.49 | 503,085.16 | 33,020,159.45 | Signed contract | ||||
PRNV/2023/623/1 | P6 | OS4.2 | 304295 | 11 | Modernization of the educational infrastructure for the students of the Faculty of Medicine and Pharmacy - building C2, campus III | ORADEA UNIVERSITY | Oradea municipality | 10,126,102.68 | 5,063,051.37 | 4,860,529.25 | 202,522.06 | 0.00 | 10,126,102.68 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305885 | 34 | Building building (1-2S)+P+E+R/M with medical clinic destination | OSTEOPROTECT SRL | Oradea municipality | 15,883,278.23 | 6,286,765.74 | 1,109,429.25 | 8,487,083.24 | 682,971.53 | 16,566,249.76 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305883 | 38 | Construction and equipment of a recovery center with S+P+E+M height regime in Ardud Vii locality, Satu Mare county | VITAL CLINIQUE SRL | Oraş Ardud | 10,108,639.92 | 6,212,817.96 | 1,096,379.64 | 2,799,442.32 | 7,903,024.30 | 18,011,664.22 | Signed contract | ||||||
PRNV/2023/131.D/1 | P1 | OS1.3 | 305886 | 35 | Increasing the competitiveness of the Medimage clinic by diversifying medical services | MEDIMAGES SRL | The municipality of Cluj-Napoca | 11,144,167.60 | 5,863,167.88 | 1,034,676.68 | 4,246,323.04 | 0.00 | 11,144,167.60 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309660 | 13 | Intelligent production: automations and innovations | FLACARA IMPEX SRL | Bistrita municipality | 4,549,805.21 | 2,763,489.09 | 487,674.55 | 2,178,261.66 | 879,260.09 | 5,429,425.30 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 309132 | 30 | INCREASING THE COMPETITIVENESS OF FEMARIS SRL THROUGH THE CONSTRUCTION OF A PRODUCTION HALL AND EQUIPPED WITH PERFORMING EQUIPMENT | FEMARIS SRL | OSORHEI | 6,415,176.25 | 3,445,583.15 | 608,044.09 | 2,361,549.01 | 1,206,243.09 | 7,621,419.34 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310555 | 43 | Advanced technologies in equipment production | INOTEC SRL | The municipality of Cluj-Napoca | 2,284,107.57 | 1,032,370.71 | 182,183.07 | 1,069,553.79 | 652,874.83 | 2,936,982.40 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 310437 | 55 | INCREASING COMPETITIVENESS AT RND AUTOMATIC SOL SRL | RND AUTOMATIC SOL SRL | Municipiul Satu Mare | 10,330,725.00 | 6,223,497.61 | 1,098,264.29 | 3,008,963.10 | 6,809,785.47 | 17,140,510.47 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 312002 | 36 | Innovation in the production of pre-wired tubes - Efficiency and Performance | BEA & MAGDA SRL | The municipality of Cluj-Napoca | 5,737,749.22 | 3,028,540.42 | 534,448.31 | 2,174,760.49 | 1,442,231.46 | 7,179,980.68 | Signed contract | ||||||
PRNV/2023/521/1 | P5 | OS3.2 | 306247 | 41 | Rehabilitation and modernization of roads in Țara Sylvania | UAT Sălaj County | Nușfalău | 296,368,642.81 | 251,913,346.38 | 38,547,823.50 | 5,907,472.93 | 120,947,405.80 | 417,316,048.61 | Signed contract | ||||||
PRNV/2023/622.A/1 | P6 | OS4.2 | 313339 | 14 | CONSTRUCTION AND EQUIPMENT OF 6 MODERN SCHOOL WORKSHOPS AT TECHNOLOGICAL HIGH SCHOOL NO. 1, CADEA | UAT Săcueni City | City of Săcueni | 11,186,100.94 | 5,593,050.47 | 5,369,328.46 | 223,722.01 | 0.00 | 11,186,100.94 | Signed contract | ||||||
PRNV/2023/131.C/1 | P1 | OS1.3 | 316629 | 37 | ROBOTICS IN THE PRODUCTION OF ELECTRICAL CABLES | RCB ELECTRO 97 SA | Bistrita municipality | 5,054,273.98 | 2,688,179.72 | 474,384.66 | 1,891,709.60 | 1,127,423.60 | 6,181,697.58 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 316955 | 83 | "IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH: IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN BETFIA, SANMARTIN MUNICIPALITY, BIHOR COUNTY IMPROVEMENT OF GREEN INFRASTRUCTURE THROUGH EXTENSION AND MODERNIZATION OF THE PARK IN CORDAU, SANMARTIN MUNICIPALITY, BIHOR COUNTY INFRASTRUCTURE IMPROVEMENT DAY THROUGH THE EXTENSION AND MODERNIZATION OF THE PARK IN THE LOCATION " | UAT SâNMARTIN MUNICIPALITY | Sânmartin | 23,561,515.06 | 20,027,287.80 | 3,062,996.96 | 471,230.30 | 345,321.91 | 23,906,836.97 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 300445 | 62 | DEVELOPMENT OF GREEN SPACE IN THE LAC HOSTEZE AREA, TOWN OF TAUțII MĐHERĂUȘ, Maramureș County | UAT The City of Tăuții Magherăuș | Town of Tăuţii- Magherăus | 8,428,844.69 | 7,164,517.99 | 1,095,749.79 | 168,576.91 | 88,455.01 | 8,517,299.70 | Signed contract | ||||||
PRNV/2023/371.B/1 | P3 | OS2.7 | 318456 | 81 | CONSTRUCTION OF A GREEN SPACE IN THE MUNICIPALITY OF NOJORID, Jud. Bihor | UAT Nojorid Commune | Nojorid | 15,666,333.32 | 13,316,383.32 | 2,036,623.33 | 313,326.67 | 0.00 | 15,666,333.32 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324092 | 70 | Revitalizarea spațiului pietonal din centrul istoric al Municipiului Turda, construire autobază și amenajare park and ride | UAT Turda Municipality | Turda municipality | 15,212,201.35 | 12,930,371.15 | 1,977,586.18 | 304,244.02 | 259,947.96 | 15,472,149.31 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324347 | 66 | Revitalizarea fizică, economică și socială a Orașului Săcueni | UAT Săcueni City | City of Săcueni | 2,009,103.41 | 1,707,737.90 | 261,183.48 | 40,182.03 | 2,116,151.16 | 4,125,254.57 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324158 | 84 | Modernizarea coridorului de mobilitate urbană integrată în zona de est a municipiului Turda | UAT Turda Municipality | Turda municipality | 20,353,178.43 | 17,300,201.66 | 2,645,913.20 | 407,063.57 | 24,205.04 | 20,377,383.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324376 | 67 | Creșterea performantei energetice a Spitalului Clinic Municipal Dr. Gavril Curteanu Oradea | UAT Oradea Municipality | Oradea municipality | 9,256,629.11 | 7,868,134.74 | 1,203,361.79 | 185,132.58 | 3,708,144.85 | 12,964,773.96 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324461 | 92 | Îmbunătățrea serviciilor educaționale și a spațiilor publice în Orașul Valea lui Mihai | UAT Valea lui Mihai city | Valea Lui Mihai city | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324161 | 46 | The regeneration of the Mihai Viteazu Obelisk area through the creation of a new public park in Turda Municipality | UAT Turda Municipality | Turda municipality | 2,359,116.09 | 2,005,248.08 | 306,685.07 | 47,182.34 | 9,817.50 | 2,369,933.59 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324407 | 64 | Modernization of the integrated urban mobility corridor in the western area of Turda Municipality | UAT Turda Municipality | Turda municipality | 14,138,350.57 | 12,017,597.98 | 1,837,985.57 | 282,767.02 | 13,105.84 | 14,151,456.41 | Signed contract | ||||||
PRNV/2024/713.Etap | Q7 | OS5.1 | 324492 | 56 | SOS (Village-Town-Resort) AQUA PRIMUS SINGEORZ-BAI | UAT City of Sangeorz Bai | City of Sângeorz-Bai | 773,964.96 | 657,870.22 | 100,615.44 | 15,479.30 | 1,039,657.68 | 1,813,622.64 | Signed contract | ||||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324429 | 71 | Development of the Lac Stei recreation area | UAT City of Stei | City of Stei | 24/05/2024 | 212,284.42 | 180,441.76 | 27,596.97 | 4,245.69 | 229,884.61 | 442,169.03 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324411 | 79 | Amenajare piste de biciclete, pod rutier peste râul Someșul Mare și asfaltare străzi în orașul Sîngeorz Băi | UAT City of Sangeorz Bai | Oraş Sângeorz- Bă | 3,927,075.71 | 3,338,014.35 | 510,519.82 | 78,541.54 | 704,760.54 | 4,631,836.25 | Signed contract | ||||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324110 | Cercetarea, proiectarea și dezvoltarea vehiculelor electrice ecologice realizate din materiale compozite avansate, echipate cu panouri fotovoltaice și realizarea unei linii de asamblare în vederea obținerii produsului final | BELCO AVIA SRL | orchards | 24/05/2024 | 21,829,162.86 | 11,135,083.06 | 1,965,014.66 | 8,729,065.14 | 8,414,091.28 | 30,243,254.14 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324472 | 57 | Creation of the Carei Recreation Center | UAT Carei Municipality | The municipality of Carei | 21/05/2024 | 21/06/2024 | 5,019,836.73 | 4,266,861.22 | 652,578.76 | 100,396.75 | 13,934.90 | 5,033,771.63 | Signed contract | ||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324112 | 80 | Modernization of the integrated urban mobility corridor in the central area of Turda Municipality | UAT Turda Municipality | Turda municipality | 31/05/2024 | 10/07/2024 | 7,586,329.85 | 6,448,380.37 | 986,222.88 | 151,726.60 | 6,805.04 | 7,593,134.89 | Signed contract | ||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324387 | ÎNFIINȚARE PARC ȘTIINȚIFIC ȘI TEHNOLOGIC BIHOR - Etapa 2 | UAT Bihor County | Oradea municipality | 28/05/2024 | 23/07/2024 | 6,787,049.12 | 2,929,091.82 | 516,898.56 | 3,341,058.74 | 0.00 | 6,787,049.12 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324493 | 58 | Titlu Proiect: Creare Centru Multifunctional Carei | UAT Carei Municipality | The municipality of Carei | 23/05/2024 | 21/06/2024 | 8,556,798.11 | 7,273,278.39 | 1,112,383.74 | 171,135.98 | 3,411,797.85 | 11,968,595.96 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324170 | 69 | Construire Centru Social de Zi, Patinoar și Skate Park în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 15,720,248.36 | 13,363,211.11 | 2,043,632.28 | 314,404.97 | 0.00 | 15,720,248.36 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324180 | 68 | Construire grădinița în Municipiul Câmpia Turzii - Etapa II | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzi | 6,337,950.65 | 3,168,975.32 | 3,042,216.32 | 126,759.01 | 1,095,550.51 | 7,433,501.16 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324556 | 42 | Creșterea gradului de participare la nivelul învățământului obligatoriu în cadrul Școlii gimnaziale nr.1 Carei | UAT Carei Municipality | The municipality of Carei | 20/05/2024 | 03/06/2024 | 3,365,186.95 | 1,682,593.47 | 1,615,289.74 | 67,303.74 | 427,597.55 | 3,792,784.50 | Signed contract | ||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324124 | 52 | Revitalizare spații publice urbane, îmbunătățirea serviciilor sociale și cultural-recreative în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 6,090,487.83 | 5,176,914.66 | 791,763.43 | 121,809.74 | 5,047,411.38 | 11,137,899.21 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324125 | 48 | Revitalizare spații publice urbane, îmbunătățirea serviciilor educaționale și sociale în orașul Târgu Lăpuș, județ Maramureș | UAT Târgu Lăpuș City | Town of Târgu Lăpuş | 7,137,878.90 | 6,067,197.07 | 927,924.26 | 142,757.58 | 61,761.00 | 7,199,639.90 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324400 | 47 | Construire locuințe sociale în Municipiul Carei | UAT Carei Municipality | The municipality of Carei | 3,823,961.94 | 3,250,367.65 | 497,115.05 | 76,479.24 | 7,850.00 | 3,831,811.94 | Signed contract | ||||||
PRNV/2024/114.Etap | P1 | OS1.1 | 324666 | Dezvoltarea Centrului de Tranfer Tehnologic al Universității din Oradea - Smart Industries - etapa II | ORADEA UNIVERSITY | Oradea municipality | 13,850,000.00 | 5,886,250.00 | 1,038,750.00 | 6,925,000.00 | 2,642,395.18 | 16,492,395.18 | Signed contract | |||||||
PRNV/2024/711.Etap | Q7 | OS5.1 | 324718 | 76 | Reabilitarea, modernizarea și dotarea Teatrului Aureliu Manea, Turda | UAT Turda Municipality | Turda municipality | 28/05/2024 | 21,631,351.46 | 18,386,648.74 | 2,812,075.69 | 432,627.03 | 0.00 | 21,631,351.46 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324127 | 86 | Improving the quality of life of the population by creating a multifunctional center and rehabilitating the central area of Baia Sprie | UAT City of Baia Sprie | City of Baia Sprie | 28/05/2024 | 8,390,900.26 | 7,132,265.22 | 1,090,817.01 | 167,818.03 | 9,996,105.20 | 18,387,005.46 | Signed contract | |||||
PRNV/2024/131.Etap | P1 | OS1.1 | 324779 | Obținerea de produse farmaceutice și dermatocosmetice inovative având la bază substanțe active de sinteză în asociere cu extracte vegetale din plante, alge şi cianobacterii | SAPIENT SRL | Oradea municipality | 28/05/2024 | 56,407,636.97 | 34,543,357.53 | 6,095,886.62 | 15,768,392.82 | 21,401,607.72 | 77,809,244.69 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324531 | 87 | Amenajare Zona Cultural-Recreativă “Trei Lacuri” din Municipiul Câmpia Turzii | UAT Câmpia Turzii Municipality | Municipiul Câmpia Turzii | 2,885,674.70 | 2,452,823.39 | 375,137.69 | 57,713.49 | 9,109,007.07 | 11,994,681.64 | Signed contract | ||||||
PRNV/2024/311.Etap | P3 | OS2.1 | 324340 | 82 | Creșterea eficienței energetice a blocurilor de locuințe în municipiul Baia Mare - CF 7 | UAT Baia Mare Municipality | Baia Mare municipality | 7,690,915.62 | 6,537,278.27 | 999,819.03 | 153,818.32 | 1,637,444.15 | 9,329,359.77 | Signed contract | ||||||
PRNV/2024/622.Etap | P6 | OS4.2 | 324236 | 93 | Dezvoltarea infrastructurii de educatie tehnologica prin modernizarea Colegiului Tehnic "Transilvania" din Municipiul Baia Mare - etapa II | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324931 | 60 | Restaurarea, conservarea și reabilitarea clădirii fostei Judecătorii (P-ța Republicii nr. 5) și redestinarea ei ca Centru de cultură, artă și tradiții | UAT Turda Municipality | Turda municipality | 13,150,110.47 | 11,177,593.90 | 1,709,514.36 | 263,002.21 | 0.00 | 13,150,110.47 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324140 | 89 | Cresterea eficientei energetice in cladirile publice din Municipiul Baia Mare-Spitalul de Pneumoftiziologie "Dr. Nicolae Rusdea" | UAT Baia Mare Municipality | Baia Mare municipality | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324515 | 74 | CENTRU MULTIFUNCȚIONAL RECREATIV MARGHITA | UAT Marghita Municipality | Marghita municipality | 12,428,309.61 | 10,564,063.17 | 1,615,680.26 | 248,566.19 | 8,526,001.96 | 20,954,311.57 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324159 | 77 | EXTINDERE, MANSARDARE, MODERNIZARE ȘI DOTARE ȘCOALA GIMNAZIALĂ NR. 1, GHERLA | UAT Gherla Municipality | The municipality of Gherla | 17,036,498.08 | 8,518,249.04 | 8,177,519.08 | 340,729.96 | 15,911,734.82 | 32,948,232.90 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324520 | 75 | Centru Educațional Multifuncțional ”Octavian Goga” | UAT Marghita Municipality | Marghita municipality | 6,453,909.86 | 3,226,954.93 | 3,097,876.74 | 129,078.19 | 9,245,321.60 | 15,699,231.46 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324396 | 63 | Reabilitare bloc de locuinte sociale strada Luminisului 13 A | UAT Baia Mare Municipality | Baia Mare municipality | 1,713,009.27 | 1,456,057.88 | 222,691.20 | 34,260.19 | 8,104,560.44 | 9,817,569.71 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324397 | 61 | Rehabilitation of social housing block, Horea street 46A | UAT Baia Mare Municipality | Baia Mare municipality | 3,125,543.30 | 2,656,711.81 | 406,320.63 | 62,510.87 | 8,821,170.06 | 11,946,713.36 | Signed contract | ||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324557 | 88 | Reabilitarea, modernizarea și dotarea spațiilor Bibliotecii Municipale “Ioan Munteanu” pentru a crea un centru cultural-recreativ, modernizarea parcului central si realizarea culoarului pietonal de legătură în zona centrală pentru a integra zona cultural-socială centrală a municipiului | UAT Marghita Municipality | Marghita municipality | 28/05/2024 | 3,609,323.42 | 3,067,924.91 | 469,212.05 | 72,186.46 | 0.00 | 3,609,323.42 | Signed contract | |||||
PRNV/2024/371.Etap | P3 | OS2.7 | 324361 | 90 | Transformarea zonei degradate malurile Somesului intre cele 2 poduri in zona de petrecere a timpului liber pentru comunitate | UAT Municipiul Satu Mare | Municipiul Satu Mare | 28/05/2024 | 7,973,696.80 | 6,777,642.28 | 1,036,580.58 | 159,473.94 | 1,157,455.66 | 9,131,152.46 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324086 | 85 | Modernizarea coridorului integrat de mobilitate urbană reprezentat de str. 1 Mai (tronson 1 Mai 182 - intersecție Str. Ion Pop Reteganu), Str. Ion Pop Rateganu - Pod Someș - Str. Libertății - Str. Bistriței până la limita administrativ teritorială a municipiului Dej, inclusiv acces către Autobaza TRANSURB Dej și modernizare Autobaza TRANSURB SA | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 11,428,422.50 | 9,714,159.13 | 1,485,694.93 | 228,568.45 | 2,522,574.35 | 13,950,996.85 | Signed contract | |||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324100 | 53 | Increasing the quality of life of the population of Dej municipality by building and equipping the cultural-recreational center and improving urban public spaces in the Dealul Florilor neighborhood | UAT Municipality Dej | The municipality of Dej | 28/05/2024 | 8,893,820.17 | 7,559,747.14 | 1,156,196.63 | 177,876.40 | 0.00 | 8,893,820.17 | Signed contract | |||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324118 | 72 | DEZVOLTAREA INFRASTRUCTURII DE TRANSPORT ALTERNATIV ÎN MUNICIPIUL DEJ - punte pietonală și modernizare coridor infrastructură integrată în Ocna Dej | UAT Municipality Dej | The municipality of Dej | 2,418,342.50 | 2,418,342.50 | 314,384.53 | 48,366.85 | 2,235,987.97 | 4,654,330.47 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324119 | 73 | Amenajarea zonei pietonale centrale în vederea reducerii emisiilor de carbon din zona centrală a municipiului Dej | UAT Municipality Dej | The municipality of Dej | 14,844,007.97 | 12,617,406.77 | 1,929,721.05 | 296,880.15 | 334,440.23 | 15,178,448.20 | Signed contract | ||||||
PRNV/2024/481.Etap | P4 | OS2.8 | 324087 | 65 | Improvement of public and non-motorized transport in the municipality of Dej | UAT Municipality Dej | The municipality of Dej | 4,633,354.42 | 3,938,351.26 | 602,336.07 | 92,667.09 | 331,277.44 | 4,964,631.87 | Signed contract | ||||||
PRNV/2024/312.Etap | P3 | OS2.1 | 324731 | 78 | Reabilitare, cresterea eficientei energetice, gestionarea eficienta a energiei la imobile existente, corpurile C2 si C20, modificari interioare, amenajari spatii de lucru in pod existent (C2) amenajare incinta si refacere imprejumuire la IPJ si DJI Cluj | POLICE INSPECTOR OF THE COUNTY. CLUJ | The municipality of Cluj-Napoca | Signed contract | ||||||||||||
PRNV/2024/714.Etap | Q7 | OS5.1 | 324120 | 50 | Creșterea calitatii vieții in municipiul Dej prin construirea si dotarea centrului social,recreativ si îmbunătăţirea spațiilor publice urbane din zona acestuia | UAT Municipality Dej | The municipality of Dej | 22,991,883.50 | 19,543,100.98 | 2,988,944.85 | 459,837.67 | 12,132,396.28 | 35,124,279.78 | Signed contract | ||||||
PRNV/2024/621.Etap | P6 | OS4.2 | 324121 | 49 | Construirea unei clădiri cu destinaţia şcoală clasele V-VIII pentru Şcoala gimnazială nr.1 Dej | UAT Municipality Dej | The municipality of Dej | 2,831,340.65 | 1,415,670.33 | 1,359,043.52 | 56,626.80 | 1,332,427.94 | 4,163,768.59 | Signed contract |